9.1 TEMPERATURE AND PRESSURE RELIEF VALVE(S) ...................................................................... 35
9.2 CATHODIC PROTECTION ................................................................................................................... 35
9.3 ELECTRONIC LOW WATER CUT-OFF ............................................................................................... 35
9.4 OPERATING TEMPERATURE CONTROL .......................................................................................... 36
9.5 HIGH WATER TEMPERATURE LIMIT ................................................................................................. 36
10: EOS (ELECTRONIC OPERATING SYSTEM) ................................................... 37
10.1 TOUCH SCREEN USER INTERFACE ............................................................................................... 38
10.2 STATUS FIELD DISPLAY .................................................................................................................. 38
10.3 OPERATIONAL SEQUENCE FIELD DISPLAY .................................................................................. 38
10.4 VIEW MENU (HOME SCREEN – DEFAULT DISPLAY) .................................................................... 39
10.5 CONTROL SYSTEMS MENU .......................................................................................... 40
10.6 CHANGING THE VENT MATERIAL TYPE ...................................................................... 41
10.7 CHANGING THE OPERATING SET POINT .................................................................... 42
10.8 SETTING THE REAL TIME CLOCK ................................................................................ 42
10.9 SCHEDULED SETBACK .................................................................................................. 43
10.10 USING THE MANUAL OVERRIDE MENU ...................................................................... 44
10.11 POTENTIOMETER ........................................................................................................... 45
10.12 USING TOOL BOX MENU ............................................................................................... 45
10.13 BASIC OPERATIONAL REFERENCE INFORMATION................................................... 45
11 COMMUNICATIONS AND DIAGNOSTICS ................................................... 47
11.1 INDICATORS .................................................................................................................... 47
11.2 ALARM MESSAGES – DIAGNOSTIC CODES (FLASHES) ............................................ 47
11.3 REPLACING THE FUSE .................................................................................................. 48
11.4 SELF-CHECK/CONTROL FAILURE ................................................................................ 48
11.5 SYSTEM SAFETY CHECKS ............................................................................................ 48
11.6 LAME CURRENT MEASUREMENTS .............................................................................. 48
11.7 NON-VOLATILE LOCKOUT/MANUAL RESET ................................................................ 48
11.8 ID CARD ........................................................................................................................... 48
12 NETWORK MENU ..................................................................................... 49
12.1 ERROR CODES ............................................................................................................... 49
13 REMOTE CONNECTIONS – TERMINAL STRIP .............................................. 51
13.1 MAKING BMS/BAS REMOTE CONNECTION FOR ANALOG AND BINARY SIGNALS 51
13.2 TERMINAL FUNCTIONS ................................................................................................. 51
14 SEQUENCE OF OPERATION ....................................................................... 52
15 INITIAL STARTUP ...................................................................................... 54
15.1 INITIAL STARTUP REQUIREMENTS.............................................................................. 54
15.2 TOOLS AND INSTRUMENTATION REQUIRED ............................................................. 54
15.3 RESOURCES ................................................................................................................... 54
15.4 ON SITE CONSIDERATIONS .......................................................................................... 54
15.5 PRE-STARTUP CHECKLIST ........................................................................................... 55
15.6 STARTUP PROCEDURE ................................................................................................. 56
16 NSF FOOD SERVICE INSTALLATION GUIDELINES ........................................ 59