GTX 327 Installation Manual Page iii
190-00187-02 Rev J
TABLE OF CONTENTS
PARAGRAPH PAGE
1. GENERAL DESCRIPTION .................................................................................................................1
1.1 INTRODUCTION.................................................................................................................................1
1.2 EQUIPMENT DESCRIPTION.............................................................................................................1
1.3 MUTUAL SUPPRESSION PULSES ...................................................................................................1
1.4 INTERFACE SUMMARY ...................................................................................................................1
1.5 GTX 327 TRANSPONDER SPECIFICATIONS .................................................................................2
1.5.1 Transponder Specifications........................................................................................................2
1.5.2 Physical Characteristics of the GTX 327...................................................................................3
1.6 EQUIPMENT AVAILABLE ................................................................................................................3
1.6.1 Configurations Available...........................................................................................................3
1.6.2 Installation Accessories .............................................................................................................3
1.7 ADDITIONAL EQUIPMENT REQUIRED.........................................................................................4
1.8 INSTALLATION APPROVAL............................................................................................................4
1.9 ATC TRANSPONDER TESTS AND INSPECTIONS ........................................................................4
1.10 LIMITED WARRANTY ......................................................................................................................5
2. INSTALLATION..................................................................................................................................7
2.1 INTRODUCTION.................................................................................................................................7
2.2 UNPACKING AND INSPECTING EQUIPMENT..............................................................................7
2.3 ANTENNA INSTALLATION..............................................................................................................7
2.3.1 Location Considerations ............................................................................................................7
2.3.2 Antenna Installation...................................................................................................................7
2.3.3 Installation Approval Considerations for Pressurized Aircraft..................................................8
2.3.4 Antenna Cable Installation.........................................................................................................9
2.3.5 Antenna Cable Connectors ........................................................................................................9
2.4 GTX 327 INSTALLATION................................................................................................................11
2.5 COOLING AIR ...................................................................................................................................11
2.6 ELECTRICAL CONNECTIONS .......................................................................................................12
2.6.1 Power and Lighting Function ..................................................................................................14
2.6.2 Altitude Functions....................................................................................................................14
2.6.3 RS-232 Serial Data Electrical Characteristics..........................................................................17
3. POST INSTALLATION CONFIGURATION & CHECKOUT PROCEDURE ................................19
3.1 AIRCRAFT STATION LICENSING REQUIREMENTS .................................................................19
3.2 OPERATION ......................................................................................................................................19
3.2.1 Function Selection Switches ....................................................................................................20
3.2.2 Function Display......................................................................................................................22
3.2.3 Code Selection .........................................................................................................................23