FLOOR BASE ACCESSORY - 1CB0514, 1CB0517, 1CB0521, 1CB0524
FOR USE WITH MODELS:
ACCESSORY KIT INSTALLATION MANUAL
Subject to change without notice. Printed in U.S.A. 397059-UAI-A-0408
Copyright © 2008 by Johnson Controls, Inc. All rights reserved. Supersedes: Nothing
Johnson Controls Unitary Products
5005 York Drive
Norman, OK 7306
GENERAL INFORMATION
The floor base is necessary when installing a downflow furnace
directly on the floor.
The base is shipped in a single piece ready to install.
This accessory floor base provides the required supply duct
clearances and allows combustion air into the furnace for
proper furnace operation.
INSTALLATION
Refer to Figure 1 and install base as follows:
1. Cut floor opening per cross section drawings and dimension
table.
2. Fabricate a warm-air plenum as shown.
3. Position the floor base over the opening in the floor.
4. Install the warm air plenum through the floor base accessory.
5. Place the furnace on the base accessory inside the corner
angle.
TABLE 1:Floor Base Dimensions
MODEL
DIMENSIONS / INCHES
A B C
1CB0514 14 1/2 12 1/8 13 1/4
1CB0517 17 1/2 15 1/8 16 1/4
1CB0521 21 18 5/8 19 3/4
1CB0524 24 1/2 22 1/4 23 1/4
FIGURE 1: Combustible Floor Base Accessory
FURNACE
WARM AIR PLENUM
WITH 1” FLANGES
FIBERGLASS
INSULATION
FIBERGLASS TAPE
UNDER FLANGE
COMBUSTIBLE FLOOR
BASE ACCESSORY
A
B
B
A
FURNACE
DEPTH
FRONT
FLOOR
1
20
PLENUM
22-1/4
FLOOR OPENING
APPROX. 1/2”
CLEARANCE
ALL AROUND
FLOOR
A
FURNACE WIDTH
COMBUSTIBLE
FLOOR BASE
1
1
APPROX. 1/2”
CLEARANCE
ALL AROUND
C
FLOOR OPENING
B
PLENUM
All dimensions are in inches. They are subject to change without notice.
Certified dimensions will be provided upon request.