Symmons Industries, Inc. ■ 31 Brooks Drive ■ Braintree, MA 02184 ■ Phone: (800) 796-6667 ■ Fax: (800) 961-9621
Copyright © 20
21 Symmons Industries, Inc.
■ symmons.
com
■ [email protected]om
■ ZV-346
7 REV A
■ 031622Installation
Section A: (Steps 1-7)
1. Slide straps in mounting tabs
2. Attach strap to studs with user provided screws
3. Insert provided screws through tabs to secure box in
place
Section B: (Step 4)
4. Knockout inside hole of supply box for water supply
5. Secure valve to box with supplied nut
6. Connect supplies to valves with either:
a. Sweat connect
b. P1 Option - Crimp PEX or
P2 Option - Cold Expansion PEX
7. Check for leaks
Section C (Steps 8 & 9)
8. Complete finish wall
9. Press on covers
a. If finish wall is 1/2’’ thick, break tabs from cover
o
b. If 2 layers of 5/8” drywall leave tabs on
Section D (Step 10)
Direct Stud Installation:
10. Mount box on adjacent side of wall stud with
provided tabs
Section E (Step 11)
Surface Mount Installation:
11. Drill holes out of box and use user provided screws
to attach to wall
1
3
4
56
2
9
10
11
Section A
Section C
Section B
Section D Section E
4