PreparingtheMachine
Important:Thiskitrequirestheinstallationofthe
levelerbeforeinstallation.
Note:Determinetheleftandrightsidesofthe
machinefromthenormaloperatingposition.
1.Parkthetractionunitonalevelsurface.
2.Disengagetheauxiliaryhydraulics.
3.Loweranyequippedattachments;refertoyour
Operator’sManual.
4.Engagethetractionunitparkingbrake.
5.Shutoffthetractionunitengineandremovethe
key.
6.Disconnectthetractionunitbattery;refertoyour
Operator’sManual.
InstallingtheScarier
1.Alignthescarierclawswiththeclawsfacing
towardthetractionunitwhileinsertingtheshaft
(Figure1)
g270274
Figure1
1.Rightclaw
3.Leftclaw
2.Centerclaw4.Shaft
Note:Theleftscarierclawisalignedsothat
thehydrauliccylindercancontacttheplateto
raiseorlowertheclaws.
2.Secureeachclawwith2boltsandlocknutsas
showninFigure2.
g270272
Figure2
Rightclawshown
1.Bolt(1/2x3inches)2.Locknut(1/2inch)
3.Torquetheboltssecuringtheclawsto91to113
N⋅m(67to83ft-lb).
4.Installthehydrauliccylinderassemblytothe
mountontheleftsideoftheleveler(Figure3).
g270273
Figure3
1.Routethehosesthrough
here
3.Nut(3/4inch)
2.Hydrauliccylinder
4.Bolt(3/4x4inches)
5.Routethehydraulichosesthroughtheopening
onthetopoftheleveleranduptheattachment
armtothecouplers.
2