Vertiv IM582138000 Netsure 2100 Installation guide

Type
Installation guide
NetSure 2100 Series
-48 VDC Power System
Installation Manual
Specification Number: 582138000
Model Number: 2100
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
The information contained in this document is subject to change without
notice and may not be suitable for all applications. While every precaution has
been taken to ensure the accuracy and completeness of this document, Vertiv
assumes no responsibility and disclaims all liability for damages resulting from
use of this information or for any errors or omissions. Refer to other local
practices or building codes as applicable for the correct methods, tools, and
materials to be used in performing procedures not specifically described in
this document.
The products covered by this instruction manual are manufactured and/or
sold by Vertiv. This document is the property of Vertiv and contains
confidential and proprietary information owned by Vertiv. Any copying, use or
disclosure of it without the written permission of Vertiv is strictly prohibited.
Names of companies and products are trademarks or registered trademarks of
the respective companies. Any questions regarding usage of trademark
names should be directed to the original manufacturer.
Technical Support Site
If you encounter any installation or operational issues with your product, check the pertinent section of this
manual to see if the issue can be resolved by following outlined procedures.
Visit https://www.vertiv.com/en-us/support/ for additional assistance.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
iii
TABLE OF CONTENTS
Admonishments Used in this Document .............................................................................................................................. v
Important Safety Instructions ................................................................................................................................................. vi
Safety Admonishments Definitions ......................................................................................................................................................................................................................... vi
Safety and Regulatory Statements .......................................................................................................................................................................................................................... vi
Déclarations de Sécurité et de Réglementation .......................................................................................................................................................................................... vi
1 Customer Documentation Package ..................................................................................................................................1
2 Installation Acceptance Checklist ....................................................................................................................................1
3 Installing the System ............................................................................................................................................................ 3
3.1 General Requirements .............................................................................................................................................................................................................................................. 3
3.2 Securing the Relay Rack to the Floor (if furnished) .....................................................................................................................................................................4
3.3 Securing the System to a Relay Rack or a Cabinet Equipment Rack (if required) ......................................................................................... 8
3.4 Securing the System to a Wall with Wall Bracket Kit P/N 541285 (if furnished) ............................................................................................... 9
3.5 Installing a List 93, 94 Battery Tray and Optional Battery Tray Circuit Breaker ............................................................................................. 12
3.5.1 Battery Tray Installation ................................................................................................................................................................................................................. 12
3.5.2 Optional Battery Disconnect Circuit Breaker Installation .............................................................................................................................. 22
3.6 Installing Circuit Breakers and Fuses ...................................................................................................................................................................................................... 23
3.6.1 Installing GMT Load Distribution Fuses (List AA, BA, BB, CA) ................................................................................................................. 23
3.6.2 Installing Bullet Nose Type Load Distribution Circuit Breakers (List CA) ..................................................................................... 25
3.6.3 Installing Bullet Nose Type Battery Disconnect Circuit Breaker (List BB) ....................................................................................26
3.6.4 Installing Compact Type Load Distribution Circuit Breakers (List BA, BB) .................................................................................. 27
3.7 Installing an Optional Battery Cabinet....................................................................................................................................................................................................29
3.8 Installing an Optional External IB4 Kit P/N 559239 .................................................................................................................................................................. 30
3.9 Attaching Supplied USB Drive Storage Pouch Near Power System ........................................................................................................................... 31
4 Making Electrical Connections ...................................................................................................................................... 32
4.1 Important Safety Instructions ......................................................................................................................................................................................................................... 32
4.2 Wiring Considerations............................................................................................................................................................................................................................................ 32
4.3 Relay Rack / Cabinet Frame Grounding Connection................................................................................................................................................................ 32
4.4 System Shelf Frame Grounding Connection .................................................................................................................................................................................... 33
4.4.1 Relay or Cabinet Rack ..................................................................................................................................................................................................................... 33
4.4.2 Wall Mounting ......................................................................................................................................................................................................................................... 33
4.5 Central Office Ground Connection ............................................................................................................................................................................................................ 33
4.6 Rectifier Nominal 120 VAC / 208 VAC / 240 VAC Input and AC Input Equipment Grounding Connections .................... 34
4.6.1 General ......................................................................................................................................................................................................................................................... 34
4.6.2 AC Input Connections to Rear AC Input IEC Receptacles, if furnished ........................................................................................... 34
4.6.3 AC Input Connections When System is Pre-Wired in a Vertiv OSP Cabinet .............................................................................. 34
4.6.4 AC Input Connections when Single AC Input Line Cord or AC Input Cable Assembly is Factory
Installed ........................................................................................................................................................................................................................................................ 34
4.7 External Alarm, Reference, Monitoring, and Control Connections .............................................................................................................................. 37
4.7.1 Connection Point Locations ...................................................................................................................................................................................................... 37
4.7.2 RS-485 Connector J5 ..................................................................................................................................................................................................................... 39
4.7.3 Mini Control Unit CAN Port Connector J4 (RJ-45) ........................................................................................................................................... 39
4.7.4 Temperature Probe Port Connectors J8 and J9 .................................................................................................................................................. 40
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
iv
4.7.5 Optional External IB4 Connector J11 ................................................................................................................................................................................ 40
4.7.6 Digital Inputs and Relay Outputs Connector J3 .................................................................................................................................................... 40
4.7.7 Circuit Breaker Alarm Connections to Battery Disconnect Circuit Breakers on Battery Trays ................................ 43
4.7.8 Circuit Breaker Alarm Connections to Battery Disconnect Circuit Breakers on Battery Cabinets ........................ 45
4.8 Mini Control Unit Ethernet Connection (if required) ................................................................................................................................................................ 47
4.9 Mini Control Unit Second Ethernet Port Connection (if Optional External IB4 Kit P/N 559239 Furnished) ....................... 48
4.9.1 General ......................................................................................................................................................................................................................................................... 48
4.9.2 Default IB4 Ethernet Port Parameters ............................................................................................................................................................................ 48
4.10 Load Distribution Wiring, Input Battery Wiring, and CO Ground Wiring ................................................................................................................ 50
4.10.1 Load Distribution Wiring, Input Battery Wiring, and CO Ground Wiring To List AA ............................................................ 50
4.10.2 Load Distribution Wiring, Input Battery Wiring, and CO Ground Wiring to List CA ............................................................... 52
4.10.3 Load Distribution Wiring, Input Battery Wiring, and CO Ground Wiring to List BA .............................................................. 54
4.10.4 Load Distribution Wiring, Input Battery Wiring, and CO Ground Wiring to List BB ............................................................... 57
4.11 Connecting to an Optional Battery Cabinet ..................................................................................................................................................................................... 60
4.12 Installing and Connecting Batteries in an Optional List 93 or 94 Battery Tray (if furnished)........................................................... 60
4.12.1 Important Safety Instructions ................................................................................................................................................................................................. 60
4.12.2 Installing and Connecting Batteries .................................................................................................................................................................................. 60
5 Installing Rectifier Modules............................................................................................................................................. 63
6 Initially Starting, Configuring, and Checking System Operation ...................................................................... 63
6.1 Important Safety Instructions ........................................................................................................................................................................................................................ 63
6.2 Initial Startup Preparation ................................................................................................................................................................................................................................. 63
6.3 Initially Starting the System ............................................................................................................................................................................................................................ 63
6.4 Configuring the System ...................................................................................................................................................................................................................................... 64
6.4.1 Mini Control Unit ................................................................................................................................................................................................................................. 64
6.4.2 Mini Control Unit (Controller) Initialization ................................................................................................................................................................ 64
6.4.3 Setting the Mini Control Unit as Required for Your Application ............................................................................................................ 66
6.5 Checking System Operation ........................................................................................................................................................................................................................... 69
6.6 Checking System Status ..................................................................................................................................................................................................................................... 74
6.7 Final Steps ........................................................................................................................................................................................................................................................................ 74
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
v
Admonishments Used in this Document
DANGER
! Warns of a hazard the reader will be exposed to that will likely result
in death or serious injury if not avoided. (ANSI, OSHA)
WARNING
! Warns of a potential hazard the reader may be exposed to that could
result in
death or serious injury if not avoided. This admonition is not used for situations that pose a
risk only to equipment, software, data, or service. (ANSI)
CAUTION
! Warns of a potential hazard the reader may be exposed to that could
result in minor or moderate injury if not avoided. (ANSI, OSHA) This admonition is not
used for situations that pose a risk only to equipment, data, or service, even if such use
appears to be permitted in some of the applicable standards. (OSHA)
ALERT
! Alerts the reader to an action that must be avoided in order to protect
equipment, software, data, or service. (ISO)
ALERT
! Alerts the reader to an action that must be performed in order to prevent
equipment damage, software corruption, data loss, or service interruption. (ISO)
FIRE SAFETY
! Informs the reader of fire safety information, reminders, precautions,
or policies, or of the locations of fire
-fighting and fire-safety equipment. (ISO)
SAFETY
! Informs the reader of general safety information, reminders, precautions, or
policies not related to a particular source of hazard or to fire safety. (ISO, ANSI, OSHA)
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
vi
Important Safety Instructions
Safety Admonishments Definitions
Definitions of the safety admonishments used in this document are listed under “Admonishments Used in this Document” on page v.
Safety and Regulatory Statements
Refer to Section 4154 (provided with your customer documentation) for Safety and Regulatory Statements.
Déclarations de Sécurité et de Réglementation
Reportez-vous à la Section 4154 (fourni avec les documents de votre client) pour les déclarations de sécurité et de réglementation.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
1
1 Customer Documentation Package
This document (IM582138000) provides Installation Instructions for the Vertiv™ NetSure 2100 -48 VDC Power System: Model 2100,
Spec. No. 582138000.
The complete Customer Documentation Package consists of…
Document Number Document Description How Provided
IM582138000
Power System Installation Instructions
Printed Manual and PDF File
UM1M831ANA
Mini Control Unit User Instructions
Printed Manual and PDF File
(per configuration file loaded into controller)
Mini Control Unit Configuration Drawing (C-drawing)
Printed Document and PDF File
UM582138000
Power System User Instructions
PDF files are provided on a supplied USB drive.
See also Note 1.
SAG582138000
Power System “System Application Guide”
UM1R481000e3 Rectifier Instructions
Section 4154 Contact Information Page
SD582138000 Power System Schematic Diagram
T582138000 Power System Wiring Diagram
Note 1: Also provided on the USB drive is a controller configuration drawing and the controller configuration files loaded into the
controller as shipped.
For factory settings of all configurable controller parameters, refer to the controller configuration drawing (C-drawing) supplied with
your power system.
2 Installation Acceptance Checklist
Provided in this section is an Installation Acceptance Checklist. This checklist helps ensure proper installation and initial operation of
the system. As the procedures presented in this document are completed, check the appropriate box on this list. If the procedure is
not required to be performed for your installation site, also check the box in this list to indicate that the procedure was read. When
installation is done, ensure that each block in this list has been checked. Some of these procedures may have been factory performed
for you.
NOTE! The system is not powered up until the end of this checklist.
NOTE! Some of these procedures may have been performed at the factory for you.
Installing the System
Relay Rack Secured to Floor (if furnished)
System Secured to Relay Rack or Cabinet Equipment Rack (if required)
System Secured to Suitable Wall (if required)
Optional Battery Tray Installed
Optional Battery Tray Battery Disconnect Circuit Breaker Installed
Circuit Breakers and/or Fuses Installed
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
2
Optional Battery Cabinet Installed
Optional External IB4 Kit Installed
Supplied USB Drive Storage Pouch Attached Near Power System
Making Electrical Connections
Relay Rack / Cabinet Frame Grounding Connection Made
System Shelf Frame Grounding Connection Made
Central Office Ground Connection Made
Rectifier AC Input and AC Input Equipment Grounding Connections Made
External Alarm, Reference, Monitoring, and Control Connections Made
Mini Control Unit Ethernet Port Connection Made
Mini Control Unit Second Ethernet Port Connection Made (if required)
Load Connections Made
Battery Connections Made
- Batteries Installed and Connected in an Optional Battery Tray
- Batteries Installed and Connected in an Optional Battery Cabinet
- External Batteries Connected
Installing the Modules
Rectifier Modules Installed
Initially Starting the System
System Started, Configured, and Checked
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
3
3 Installing the System
3.1 General Requirements
NOTE! The system is furnished for 19” mounting as standard. For 23” mounting, replace the 19” mounting brackets on the
shelf with the 23” mounting brackets (supplied with the system). A wall mounting option is also available. See
SAG582138000 for ordering information.
The installer should be familiar with the installation requirements and techniques to be used in securing the relay rack (if
furnished) to the floor.
The installer should be familiar with the installation requirements and techniques to be used in securing the system to a
relay rack or equipment rack.
- The top rear cover needs to be removed to access the battery and/or CO ground connection points. If other equipment
is mounted above the shelf, leave enough clearance to access the screws securing the cover.
The installer should be familiar with the installation requirements and techniques to be used in securing the system to a
suitable wall (if required).
This product is intended only for installation in a restricted access location on or above a non-combustible surface.
This product must be located in a controlled environment with access to crafts persons only.
This product is intended for installation in network telecommunication facilities (CO, vault, hut, or other environmentally
controlled electronic equipment enclosure).
This product is intended for connection to the common bonding network in a network telecommunication facility (CO, vault,
hut, or other environmentally controlled electronic equipment enclosure).
The DC return connection to this system can remain isolated from system frame and chassis (DC-I).
This system is suitable for installation as part of the Common Bonding Network (CBN).
The system must be mounted in an environment that does not exceed the rated operating ambient temperature range
found in SAG582138000.
Clearance requirements are (relay rack or equipment rack):
- Minimum clearance is one inch from the face of the rectifier modules and one inch from the surface of the rear sheet
metal (for ventilation only; operation, installation and maintenance require more clearance).
- Recommended minimum aisle space clearance for the front of each bay is 2' 6"
(for operation and maintenance).
- Recommended minimum aisle space clearance for the rear of each bay is 2’ 0”
(for installation and maintenance).
- List AA and CA: No space required above or below the unit (for ventilation only, installation and maintenance may
require more clearance).
- List BA and BB: 1RU of space is required above (preferred) or below the unit (for ventilation only, installation and
maintenance may require more clearance).
Clearance requirements are (cabinet or wall mounting):
- Minimum clearance is one inch from the face of the rectifier modules and one inch from the surface of the rear sheet
metal (for ventilation only; operation, installation and maintenance require more clearance).
- The system may also be mounted horizontally or vertically. Vertical mounting can be with the distribution located at the
top of the unit orientation or at the bottom of the unit orientation.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
3.2 Securing the Relay Rack to the Floor (if furnished)
Secure the relay rack to the floor per site requirements. Refer to “General Requirements” on page 3.
Ventilation Requirements
Refer to “General Requirements” on page 3.
Relay Rack Floor Mounting Dimensions
Refer to Figure 3.1 and Figure 3.2 for relay rack floor mounting dimensions.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
5
Figure 3.1 Relay Rack Floor Mounting Dimensions - 23” (cont’d on next page)
Part No. 559817
Part No. 559819
Part No. 559818, 559820,
559821, 559822
17.50
20.13
24.38
2.13
3.44
9.88
12.53
15.00
1.24
2.56
0.875 Dia.
(8 Places)
Masked for Frame Ground Lug
0.281 Dia. Holes on 0.625 Centers
(Top of Rack, 2 Places)
22.500
24.750
1.125
15.000
17.500
20.125
25.000
2.437
3.750
9.871
12.531
15.031
1.250
2.580
2.00
1.00
1.00
2.00
2.00
2.00
5.00
0.437 Dia.
(12 Places)
Masked for Frame Ground Lug
0.281 Dia. Holes on 0.625 Centers
(Top of Rack, 2 Places)
0.875 Dia.
(8 Places)
Masked for Frame Ground Lug
0.281 Dia. Holes on 0.625 Centers
(Top of Rack, 1 Place)
Notes:
1. All dimensions are in inches.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
6
Figure 3.1 Relay Rack Floor Mounting Dimensions - 23” (cont’d from previous page)
19.685
25.80
15.000
1.50
2.83
18.00
0.875
8 Places
Part No.
562353 12.340
22.310
3.06
1.74
Notes:
1. All dimensions are in inches.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
7
Figure 3.2 Relay Rack Floor Mounting Dimensions - 19”
Part No. 559823
Part No. 559824
13.50
16.13
20.38
2.13
3.44
9.88
12.53
15.00
1.24
2.56
0.875 Dia.
(8 Places)
Masked for Frame Ground Lug
0.281 Dia. Holes on 0.625 Centers
(Top of Rack, 2 Places)
Masked for Frame Ground Lug
0.281 Dia. Holes on 0.625 Centers
(Top of Rack, 2 Places)
14.13
16.75
21.00
2.13
3.44
9.38
12.03
15.00
1.49
2.81
0.875 Dia.
(8 Places)
Notes:
1. All dimensions are in inches.
Masked for Frame Ground Lug
0.334 Dia. Holes on 0.625 Centers
(Top of Rack, 2 Places)
Part No. 563922
15.69
18.31
21.80
1.76
3.07
12.34
15.00
18.00
1.50
2.83
0.812 Dia.
(8 Places)
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
8
3.3 Securing the System to a Relay Rack or a Cabinet Equipment Rack (if
required)
DANGER! If the system is mounted in a relay rack, the relay rack must be securely anchored to the floor before the system is
installed.
NOTE! Refer to “General Requirements” on page 3 for mounting restrictions and ventilation requirements.
This power system is designed to mount in a standard 19” or 23” relay rack or equipment rack having 1” or 1 3/4” multiple drillings.
Refer to System Application Guide SAG582138000 for overall dimensions and a list of available relay racks.
Procedure
1. The system is furnished for 19” mounting as standard. For 23” mounting, replace the 19” mounting brackets on the shelf with
the 23” mounting brackets (supplied with the system).
2. Position the system in the relay rack or cabinet equipment rack.
3. Secure the system to the relay rack or cabinet equipment rack using hardware as shown in Figure 3.3 (see Figure 3.3 for
recommended torque). Use grounding washers as indicated in Figure 3.3.
NOTE! Install (orient) the ground washers so the teeth dig into the mounting angles for a secure ground connection.
NOTE! Compliance with Telcordia GR-1089-CORE requires that prior to mounting the system to the equipment rack:
o All paint must be removed from the front surface of each equipment rack rail where it mates with a
shelf-mounting bracket, so that good metal-to-metal contact can be established between the shelf
and rack.
o The shelf-to-rack mating surfaces must be cleaned.
o Electrical anti-oxidizing compound must be applied to the shelf-to-rack mating surfaces.
Figure 3.3 Mounting the System in a Relay Rack or a Cabinet Equipment Rack
Front
Mounting Hardware
12-24 x 3/4" Thread Forming
Hex Head Screw
No. 10/12 Ground Washer
Torque: 65 in-lbs.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
9
3.4 Securing the System to a Wall with Wall Bracket Kit P/N 541285 (if
furnished)
An optional wall mount bracket kit (P/N 541285) is available for horizontal or vertical wall mounting of the system.
NOTE! Refer to “General Requirements” on page 3 for mounting restrictions and ventilation requirements.
Procedure
1. The installer must provide fasteners for securing the system to a wall or other vertical surface. Ensure that the wall and
fastening technique are suitable for supporting the weight of the system. Refer to System Application Guide SAG582138000
for system weight and additional dimensions.
2. Select either the vertical-mount or horizontal-mount brackets as required for your application. Attach the brackets to the
system mounting angles using kit-furnished screws. Torque to 60 in-lbs. Refer to Figure 3.4 or Figure 3.5.
3. Using the drill guide dimensions in Figure 3.4 or Figure 3.5, prepare the wall for customer-furnished fasteners. Secure the
system to the wall.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
10
Figure 3.4 Horizontal Wall Mounting with P/N 541285
0.90
18.80
Wall Mount Drill Guide (Not to scale)
0.277 Dia. Clearance
Hole in Bracket
for Wall Fastener
.90
18.80
13.19
19.53
Notes:
1. All dimensions are in inches, unless otherwise specified.
2. Installer to furnish hardware for fastening brackets to wall.
Front
Horizontal
Wall Mounting
Bracket (2)
Installer to furnish hardware
for fastening brackets to wall.
Fasten kit brackets
to shelf angles with
kit-furnished fasteners.
Fasten kit brackets
to shelf angles with
kit-furnished fasteners.
Installer to furnish hardware
for fastening brackets to wall.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
11
Figure 3.5 Vertical Wall Mounting with P/N 541285
Notes:
1. All dimensions are in inches, unless otherwise specified.
2. Installer to furnish hardware for fastening brackets to wall.
18.31
1.15 .75
2.68
19.80
Wall Mount Drill Guide (Not to scale)
1.15
18.3
0.277 Dia.
Clearance
Hole in
Bracket
for Wall
Fastener
(Front)
Rear
Vertical
Wall Mounting
Bracket (2)
Fasten kit brackets
to shelf angles with
kit-furnished fasteners.
Fasten kit brackets
to shelf angles with
kit-furnished fasteners.
Front
Installer to
furnish hardware
for fastening
brackets to wall.
Installer to
furnish hardware
for fastening
brackets to wall.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
12
3.5 Installing a List 93, 94 Battery Tray and Optional Battery Tray Circuit
Breaker
Perform the following procedures to install a battery tray and optional battery tray circuit breaker.
DANGER! The relay rack must be securely anchored to the floor before a battery tray is installed.
3.5.1 Battery Tray Installation
Procedure
1. To install a battery tray, perform the procedure detailed in Figure 3.6. See also Figure 3.7, Figure 3.8, Figure 3.9, Figure 3.10,
Figure 3.11, Figure 3.12, and Figure 3.13.
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
13
Figure 3.6 Installing a List 93, 94 Battery Tray
Battery
Tray
Rear
Angle
Bracket
Rear Angle Bracket
Cabling
Bracket
Front Rear
1. Slide battery tray into relay rack and
secure to relay rack with 12-24 x 3/4"
thread forming hex head screws and
#10/12 ground washers (1 place per
side) or #12 flat washers (3 places per
side). (Torque to 70 in-lbs).
2. Secure rear angle brackets (both sides)
to battery tray with 1/4-20 x 3/4” bolts,
1/4” flat washers, 1/4” lock washers, and
1/4” nuts. (Torque to 84 in-lbs).
3. Secure rear angle brackets (both sides)
to relay rack with 12-24 x 3/4" thread
forming hex head screws and #10/12
ground washers (1 place per bracket)
or #12 flat washers (1 place per bracket).
(Torque to 70 in-lbs).
4. Secure cabling brackets (both sides) to
relay rack with 12-24 x 1/2" thread forming
hex head screws. (Torque to 70 in-lbs).
P/N 559806, 559807, 559808, 559811, 10012262.
P/N 559809, 559810, 559812 similar
P/N 559809, 559810, 559812
Vertiv™ NetSure™ 2100 -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
14
Figure 3.7 559806 Battery Tray
559806
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82

Vertiv IM582138000 Netsure 2100 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI