CL0824SDCWH

CrystaLok CL0824SDCWH Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the CrystaLok CL0824SDCWH Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1. Set the window into the rough opening
from the outside with the nailing n overlap-
ping the exterior sheathing. Make sure that
the weep holes are at the bottom.
2. Use a sealant appropriate for the existing
materials and building conditions, approved
by the sealant manufacturer and conforming
to AAMA 800. Apply a continuous and
generous bead between the exterior sheath-
ing and the nailing n in line with the
pre-punched nailing holes. Press the nailing
n into the sealant prior to nailing.
3. Center the window in the rough opening
and level it by placing shims at the sill near the
corners and every 16" across the sill. Plumb
the jambs of the window, and shim as neces-
sary.
4. Secure the window into the opening with
2" galvanized roong nails; drive a nail into
every pre-punched hole. Apply sealant over
each nail head.
5. Apply self-sealing ashing tape and build-
ing paper according to the manufacturers
instructions or as specied in AAMA 2400-02.
INSTALLATION
INSTRUCTIONS
/