8” WALL MOUNT
INSTALLATION
30 Samuel Barnet Blvd.
New Bedford, MA 02745
(508) 995-2200
Page 1
PROPER INSTALLATION IS IMPORTANT. IF YOU NEED ASSISTANCE, CONSULT A CONTRACTOR,
ELECTRICIAN OR TELEVISION ANTENNA INSTALLER (CHECK WITH YOUR LOCAL BUILDING SUPPLY,
OR HARDWARE STORE FOR REFERRALS).
Slip the swaged end of mast A into the
round end of mast B.
1
2
WOOD BLOCK
SWAGED END
Tap the two sections together with a hammer.
A piece of wood will protect the end from
damage.
8 INCH WALL
BRACKET
MAST B
SWAGED
END
MAST A
MAST B
MAST A
LAG
SCREW
LAG
SCREW
CLAMPING
SCREWS
Select a location that will provide the highest,
unobstructed position for the wind sensors.
3
MAST
7/16”
HAMMER
TAPE MEASURE
7/16” WRENCH
3
8
/ ”
3/8” WRENCH
TOOLS
REQUIRED
DRILL WITH
1/8” DRILL BIT
SLOTTED SCREW
DRIVER
PHILLIPS SCREW
DRIVER
LEVEL
BRACKET WILL
ACCOMMODATE
UP TO 8 INCH
OVERHANG OF EAVE