Allied Brass FT-26-BKM, FT-26-CA, FT-26-PB, FT-26-PC, FT-26-SN Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Allied Brass FT-26-BKM Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Soap Dish
Backplate
Screw
Set Screw
0.7
Step 1:
Determine your desired location for installation and make a mark for the location . Make 2 marks where mounting screws will
be placed as shown below. Mark for location of installation.Drill hole at each end of the marks.
Drill holes in Wall for Backplate Mounting
Attach Soap Dish to Backplate
Step 2:
Mount Backplate to desired location and screw them in placed.Then insert Soap Dish into Backplate and tighten with Set
Screw provided.
FT-26
INSTALLATION INSTRUCTIONS
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.
/