Allied Brass CH-93-ABZ Installation guide

Type
Installation guide
23.00 "
O
0.496
0.25
DETAIL O
Step 1:
Determine your desired location for installation and make a mark for the location of the base plate. Make 2 marks each side
where mounting screws will be placed as shown below. Drill hole at each of the marks.
Drill holes Ceiling to mount base plate.
CH-93
INSTALLATION INSTRUCTIONS
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.
P
MIRROR
DETAIL P
BASE PLATE
BASE TUBE
SCREW
Step 2:
Loosen threaded rod. Then fasten base plate with screws provided to the ceiling.
Attaching Base Plate to Ceiling
PERSPECTIVE
CH-93
INSTALLATION INSTRUCTIONS
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.
  • Page 1 1
  • Page 2 2

Allied Brass CH-93-ABZ Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI