5
Fig. 4
I
J
DD
3. Insert one Wood Dowel (KK) into each of the
pre-drilledholesonthetopedgesoftheAssembly
fromstep2.ThenlocateMediaTop(G)andlay
finishedsideupontopofcompletedassemblyFrom
the inside, attach Media Top (G) using Bolts (AA)
and Washers (BB) through the pre-drilled holes in
themountingblocks.
HAND TIGHTEN ONLY.
UsingPhillipsheadscrewdrivertightenallBolts
alternatingtopandbottom,leftandright.
4. Locate Center Back Panel (J), using a Phillips Head
screw driver,tighten screws (DD) through the
pre-drilled holes in the Center Back Panel to the
completedassembly.
Locate Left Back Panel (I), using a Phillips Head
screw driver,tighten screws (DD) through the
pre-drilled holes in the Left Back Panel to the
completedassembly.
AA
KK
BB
Fig. 3
G
Hardware Used
Hardware Used
BB
AA
DD
Bolt
Screw
x 8
x 15
Washer x 8
Fig. 5
EE
M
HH
HH
Handle
(with bolt)
x 2
Hardware Used
EE
Screw x 12
5. Connect the Right Front Door (M) to the Right Side
Panel (F) with the hinge pre-installed on the door,
then use a Phillips head screwdriver to tighten the
Screws (EE) through the pre-drilled holes.
Attach the Handle (HH) to the Front Door (M), use
the bolts attached through the pre-drilled holes in
the door. Then use a Phillips Head Screwdriver to
tighten the bolts.
Repeat the other side.
Therearelevelerslocatedunderthemantelwhich
the height can be increased by twisting
counter-clockwise.
KK
Wood Dowel x 8