Arch Environmental Equipment CTS 9000 IRRD Operation and Installation Manual

Type
Operation and Installation Manual

Arch Environmental Equipment CTS 9000 IRRD

The Arch Environmental Equipment CTS 9000 IRRD is an infrared belt rip detection unit designed to monitor conveyor belts for rips, tears, and other damage. The unit uses an infrared beam to detect objects protruding through the belt or material falling onto the catch plate, triggering an alarm when a problem is detected.

Key features of the CTS 9000 IRRD include:

  • Automatic detection: The unit continuously monitors the belt, automatically detecting and alarming on any rips or tears.
  • Adjustable sensitivity: The sensitivity of the beam can be adjusted to suit different belt types and applications.

Arch Environmental Equipment CTS 9000 IRRD

The Arch Environmental Equipment CTS 9000 IRRD is an infrared belt rip detection unit designed to monitor conveyor belts for rips, tears, and other damage. The unit uses an infrared beam to detect objects protruding through the belt or material falling onto the catch plate, triggering an alarm when a problem is detected.

Key features of the CTS 9000 IRRD include:

  • Automatic detection: The unit continuously monitors the belt, automatically detecting and alarming on any rips or tears.
  • Adjustable sensitivity: The sensitivity of the beam can be adjusted to suit different belt types and applications.
1
BELT PROTECTION UNIT
CTS 9000 IRRD
INFRA-RED BELT RIP
DETECTION UNIT
OPERATIONS
AND
INSTALLATION MANUAL
INFRA-RED RIP DETECTOR
Close Window
Print
TYPE: CTS 9000 IRRD
INSTALLATION AND OPERATION
Tools Required For Installation:
The following tools are required for the installation of the belt misalignment unit :
1. Drill and extension.
2. ½ Inch Diameter Drill Bit.
3. 2 x 9/16 inch wrenches.
4. Adjustable Wrench.
5. 6mm flat screw driver.
6. 3mm flat screw driver.
Installation:
To install the CTS 9000 IRRD drill ½” holes into the conveyor structure matching the holes
on the CTS 9000 IRRD base plate, place the CTS 9000 IRRD on the conveyor structure
over the holes and bolt it down with supplied bolts. To connect the CTS 9000 IRRD, refer to
the CTS 9000 IRRD Control Box Wiring Diagram, and connect a cable to the COM terminal
and the N/O (Normally Open) or N/C (Normally Closed) contact depending on the
application.
ph 220VAC
ph 110VAC
N
1
2
3
4
WASH TRIP
LED1 LED2
LED1
LOCK
OUT
RESET P/B
WASH P/B
N/O
COM
N/C
Operation:
If an object is protruding through the belt as it passes the CTS 9000 IRRD it will break the
infrared beam and the unit will trip. If there is a longitudinal rip in the conveyor belt material
will fall onto the catch plate which then builds up and breaks the infra-red beam causing the
2
3
aintenance:
unit to trip. When the unit trips the normally open contacts will close and the normally closed
contacts will open or visa versa depending on which contacts are used. If the CTS 9000
IRRD is tripped and you wish to reset it, insure the rip in the conveyor belt has been fixed or
the object has been removed from the belt. Once the problem, which caused the trip, is
corrected, press the wash button and clear the catch plate of any material. Then reset the
CTS 9000 IRRD by pressing the reset button. The DELAY TIME SELECTOR in the control
box can set the time that the infrared beam must be broken to trip the unit. When the unit is
tripped the lockout led will be illuminated and the trip led will be illuminated every time the
infrared beam is broken.
M
he CTS 9000 IRRD are dirty and you wish to clean them without tripping the
rouble-Shooting:
If the covers of t
unit, press the wash button to disable the infra-red beam. The amount of time needed to
clean the lenses or wash down the unit can be set using the SET WASH TIME selector in
the control box. When the unit is in wash mode the wash led will be illuminated and the
covers may be cleaned without tripping the unit. An audible alarm will sound for 30 seconds
before the unit returns to normal working operation..
T
Is TRIP LED
Illuminated?
YES
Check All
Connections and
Power Source
Replace/Clean
Lens Covers
YES
Are Beams/Boxes
Misaligned
(Inside Boxes)
-Damaged-
Align/Replace
Boxes
Remove Covers
from Send/
Recieve Units
Does Unit Reset?
With Beam
Obstructed, will
Unit TRIP?
Return Unit to
Service
YES
Establish Reliable
Power Source
With Beam
Obstructed, will
Unit TRIP?
YES
YES
NO
NO
Consult
Factory
NO NO
aintenance Schedule:M
. It is recommended that all nuts, bolts, screws and connections be checked and
1
tightened every six months.
4
lubrication.
Standard Installation Dimensions:
2. The unit does not require any
CONTROL UNIT TRANSMIT UNIT
SIDE VIEW
TOP VIEW
INFRARED BEAM
OBSTRUCTION
RECEIVE UNIT
ote:N The dimensions shown are standard dimensions and may be modified to meet
pecifications:
the requirements of a specific application.
S
110/220 VAC
AC
Supply Voltage:
Current Requirement: 1 Amp
Contact Rating: 10 A – 250 V
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Arch Environmental Equipment CTS 9000 IRRD Operation and Installation Manual

Type
Operation and Installation Manual

Arch Environmental Equipment CTS 9000 IRRD

The Arch Environmental Equipment CTS 9000 IRRD is an infrared belt rip detection unit designed to monitor conveyor belts for rips, tears, and other damage. The unit uses an infrared beam to detect objects protruding through the belt or material falling onto the catch plate, triggering an alarm when a problem is detected.

Key features of the CTS 9000 IRRD include:

  • Automatic detection: The unit continuously monitors the belt, automatically detecting and alarming on any rips or tears.
  • Adjustable sensitivity: The sensitivity of the beam can be adjusted to suit different belt types and applications.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI