Again Faster XTE X2 Assembly Instructions

  • Hello! I am an AI chatbot trained to assist you with the Again Faster XTE X2 Assembly Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
XTE X2 SQUAT RACK
ASSEMBLY INSTRUCTIONS
BILL OF MATERIALS
Le Leg (1x)
Right Leg (1x)
Boom Cross Beam
(1x)
Upright Tube (2x)
Weight Storage Peg
(2x)
Pullup Bar (1x)
Other Hardware Included:
M12 x 100 Bolt (16x) Hex Nut - 1” (2x)
M12 Washer (32x) J Cup (2x)
M12 Lock Nut (16x)
1
The rst step in assembling your squat rack is to aach
the legs of the squat stand to the cross beam. See the
image below
Its much easier to connect the uprights to
the legs once they are aached to the
cross beam.
2
Insert the upright into its slot on the le leg and ax it with the 4 bolts as
shown above. Once the upright is secure you can also aach the weight
storage peg through the 1” hole directly above the leg. Use the 1” hex nut
to secure it. Repeat this for the right leg.
3
The last step in assembling your squat rack is to aach the
pullup bar at the top of the uprights. See the above image for
aachment procedure. 2 Bolts are required for each side.
Note: the height of the pullup bar is adjustable. The image
above is just one possible conguraon.
/