Dometic Furnace High Static Baffle Installation guide

  • Hello! I'm a chat assistant and I've analyzed the provided user manual for the High Static baffle installation. This document includes step-by-step instructions for installing the baffle, including how to position the deflector and secure the cover plate. I am ready to answer all your questions about the installation process.
  • Where should I locate the front vent knock-out?
    How should the deflector be positioned?
    How is the deflector secured?
    How should I position the duct cover plate?
High Static Baffle Installation
1) Locate front vent knock-out on
blower side of furnace.
2) To separate knockout from casing
break the four stays shown here.
3) The deflector must be
positioned between the
furnace chamber and the
vertical blower deflector
4) Secure the deflector
to the exterior of the
casing as shown using
existing screw.
5) Position the duct cover
plate over the
knock-out opening with
the plate tabs inside the
casing.
6) Rotate the plate
tabs away from the
notch in the knock
out opening.
8) Install addition self-
tapping screw to keep
the deflector from
rotating.
9) Final assembly view of all
items included in the high
static baffle installation.
7) Tabs lock either
side of bracket.
Form No. 31126_A 10/12/18
/