Instant Mosaic SAMPLE60203 Installation guide

Type
Installation guide

This manual is also suitable for

Upscale Designs by EMA
Polystyrene Mouldings Installation Guide
Important:
Wear safety mask and goggles when cutting polystyrene
mouldings.
Store moulding and adhesive in room temperature for at
least 48 hours in order to avoid expansion or contraction.
Polystyrene mouldings can be glued, nailed or both.
Tools:
Measuring tape Fine tooth saw Mitre saw Pencil Safety
goggles Safety mask Hammer or finishing nailer Putty knife
Caulking gun
Installation Instructions:
Prepare the wall: Prior to installing mouldings ensure walls are
clean, flat, dry, and free of grease or dust.
Cut the panels: Cut quickly to avoid melting and achieving a
clean cut. A blade with 60 teeth or more is recommended. Cut ¼
longer when filling a gap.
If gluing the panels:
Apply a continuous ¼” bead of heavy duty construction
adhesive along the back grooves or edges of the base
moulding.
When installing subsequent panels, ensure the ends but
together precisely
Fill seams with transparent filler. Wipe excess filler
immediately before is dries up.
If nailing the panels:
Use a finish nailer or hammer
When installing subsequent panels, ensure the ends but
together precisely
Fill seams with transparent filler. Wipe excess filler
immediately before is dries up.
Finishing: If walls are not flat, fill any gaps with transparent
caulk. Clean excess caulk with a sponge or soft cloth.
And lastlywe would highly appreciate if you can take a moment
to send us a picture of your project at EMA@NewLinkz.com
Questions? Call Us: 1 855 855 8800
  • Page 1 1
  • Page 2 2

Instant Mosaic SAMPLE60203 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI