NEXT by Danco 10839 Operating instructions

Type
Operating instructions

This manual is also suitable for

Insert into pipe. Rotate nut clockwise
until PlugAll does not easily slip inside
pipe. Rotate nut a maximum of 2 full
turns. Then, check for leaks.
Insert into pipe. Rotate nut clockwise until
it has become hand tight. Then, check
for leaks.
Nut
Compression Disk
Rubber Gasket
Threaded Stem
2" PIPE
1 ½" &
2” CLEANOUT
1 ½" PIPE
WARNING: Hand tighten only. Do not overtighten.
CAUTION: Stand clear when pressure testing.
AVERTISSEMENT: Serrez à la main uniquement. Ne serrez pas trop.
ATTENTION: Écartez-vous pendant les tests de pression.
10839C
2727 Chemsearch Boulevard Irving, Texas 75062
©2018 Danco, Inc. All rights reserved.
  • Page 1 1

NEXT by Danco 10839 Operating instructions

Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI

in other languages