ferm LIVING Haze Wall Cabinet Assembly Manual

Type
Assembly Manual
HAZE WALL CABINET
ASSEMBLY MANUAL
fermliving.com
CONTENT OF THE BOX ASSEMBLY PROCESS
NOTE:
Please note to check that the screws
included can be used for your type of wall.
Dierent walls requires dierent type of tools.
1 x Cabinet
2 x Shelves
1 x Wall bracket
3 x Screws
3 x Rawlplugs
NB:
To make the cabinet open
from the opposite side:
Flip the wall cabinet
’upside down’ and hang
it on the wall bracket.
Hang the wall cabinet
on the mounted
wall bracket
Insert the 2 shelves.
The cabinet tolerates a
max. load of 5 kg in total.
Mount the wall bracket
to the wall by drilling
the 3 holes and inserting
rawlplugs and screws.
2
1
3
NB!
MAX. LOAD 5 KG
  • Page 1 1
  • Page 2 2

ferm LIVING Haze Wall Cabinet Assembly Manual

Type
Assembly Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI