Construction Metals 3W4BR Operating instructions

Type
Operating instructions

This manual is also suitable for

3-WAY ROOF EDGE
INSTALLATION GUIDELINES
These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional, and to
check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
Roof Deck
Old Underlayment
New Underlayment
Old Shingle
New Shingle
OLD SHINGLES
UNDERLAYMENT
NEW SHINGLES
3-WAY
ROOF EDGE
3-WAY ROOF EDGE ENCAPSULATES THE
OLD SHINGLES PRIOR TO RECOVER
Recover: Applying a new, additional layer of shingles
on top of an already existing shingle roof. Typically,
the maximum number of layers allowed is two, on
roofs with a 4/12 slope or less.
Trim any curled shingle corners and remove any
curled tabs, replacing them with flat shingle scraps.
Install 3-Way Roof Edge on rakes and eaves, leaving
a neat protected edge.
Start with the eave edge then the rake. Overlap
sections at least 2 inches. 3-Way Roof Edge should
be nailed every 12 inches or more nails in
highwind conditions.
  • Page 1 1

Construction Metals 3W4BR Operating instructions

Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI