Spectrum Industries Locking Pull-out Drawer Owner's manual

Type
Owner's manual

This manual is also suitable for

(2) 1/4-20 x 15mm JC bolts
with
(2) 1/4-20 locknuts
0190793 Page 1 of 1
Assembly Instructions
Important
Before you begin, read and comply with all safety and operating instructions,
and ensure all parts and correct quantities are included.
Any parts damaged during shipment must be reported within 5 days of receipt.
To report information regarding missing parts or damage, to purchase parts
or accessories, or if you have any questions, please contact us.
www.spectrumfurniture.com
800-235-1262, 715-723-6750
Thank you for purchasing Spectrum products!
© 2018 Spectrum Industries Inc., All rights reserved.
925 FIRST AVENUE, CHIPPEWA FALLS, WI 54729 / 800-235-1262 / 715-723-6750 / WWW.SPECTRUMFURNITURE.COM
1. Carefully ip the workstation upside-down onto a non-abrasive
surface. This may require 2-3 people.
2. Relocate the (2) existing worksurface cord wraps to the bottom of
the assembly as shown with 1/4-20 x 15mm JC bolts and locknuts.
Figure 1.
3. Attach the locking drawer assembly to the worksurface with (10) #14
x 7/8” PHSM screws.
4. Route the power cord through the side grommet.
Tools
Required
Installation
Locking pull-out drawer
for Pivot Workstation
37330
(10) 0101382
#14 x 7/8” PHSM
(1) Locking pull-out
drawer assembly
Figure 1
(4) 052605
1/4-20 x 15mm
JC bolt
(4) 041943
1/4-20 locknut
(10) #14 x 7/8” PHSM
Locking drawer assembly
Cord wraps
or
Worksurface
Relocate existing
worksurface cord
wraps
with (2) 059984 2”
Grommets installed
  • Page 1 1

Spectrum Industries Locking Pull-out Drawer Owner's manual

Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI