Lovibond Thermoreactor RD 125 Owner's manual

Category
Space heaters
Type
Owner's manual

This manual is also suitable for

R
125
www.lovibond.com
Lovibond
®
Water Testing
Tintometer
®
Group
RD 125
DE
GB
FR
ES
IT
Bedienungsanleitung
Instruction Manual
Mode d‘emploi
Instrucciones
Istruzioni d‘uso
2
RD 125_7b 01/2020
Konformitätserklärung mit gefordertem Inhalt gemäß EN ISO/IEC 17050-1
Supplier's declaration of conformity in accordance with EN ISO/IEC 17050-1
4 / 8.2018
Ausgabedatum/
Edition
2013-07
2011-07
2014
2013-02
Name:
Anschrift / Address:
Name:
Anschrift / Address:
Dortmund
21.8.2018
Doc file:
CSB - COD Thermoreactor RD 125 - AL 125 DokNr_4__8_2018
DIN EN 50581
Technische Dokumentation zur Beurteilung von Elektro- und Elektronikgeräten hinsichtlich der
Beschränkung gefährlicher Stoffe; Deutsche Fassung EN 50581:2012
wird hiermit erklärt, dass es den grundlegenden Anforderungen entspricht, die in den nachfolgend bezeichneten Harmonisierungsrechtsvorschriften festgelegt sind: / it is hereby declared that it
complies with the essential requirements which are determined in the following harmonisation rules:
EU-Konformitätserklärung / EU-Declaration of Conformity
Dokument-Nr. / Monat.Jahr:
Document No. / Month.Year:
Für das nachfolgend bezeichnete Erzeugnis / For the following mentioned product
Bezeichnung / Name,
Modellnummer / Model No.
CSB - COD Thermoreactor RD 125 - AL 125 , (2)418940
EN 61010-2-010
Sicherheitsbestimmungen für elektrische Mess-, Steuer-, Regel- und Laborgeräte - Teil 2-010:
Besondere Anforderungen an Laborgeräte für das Erhitzen von Stoffen (IEC 61010-2-010:2014)
Richtlinie 2014/30/EU des Europäischen Parlaments und des Rates vom 26. Februar 2014 zur Harmonisierung der Rechtsvorschriften der Mitgliedstaaten
über die elektromagnetische Verträglichkeit .
Directive 2014/30/EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the Member States relating
to electromagnetic compatibility .
Richtlinie 2014/35/EU des Europäischen Parlaments und des Rates vom 26. Februar 2014 zur Harmonisierung der Rechtsvorschriften der Mitgliedstaaten
über die Bereitstellung elektrischer Betriebsmittel zur Verwendung innerhalb bestimmter Spannungsgrenzen auf dem Markt .
Directive 2014/35/EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the Member States relating
to the making available on the market of electrical equipment designed for use within certain voltage limits .
RICHTLINIE 2011/65/EU DES EUROPÄISCHEN PARLAMENTS UND DES RATES vom 8. Juni 2011 zur Beschränkung der Verwendung bestimmter gefährlicher
Stoffe in Elektro- und Elektronikgeräten (Neufassung)
DIRECTIVE 2011/65/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 8 June 2011 on the restriction of the use of certain hazardous
substances in electrical and electronic equipment (recast)
Angabe der einschlägigen harmonisierten Normen, die zugrunde gelegt wurden, oder Angabe der Spezifikationen, für die die Konformität erklärt wird: / Information of relevant harmonised
standards and specifications on which the conformity is based:
Fundstelle / Reference Titel / Title
Harmosisierte Normen / Harmonised Standards
DIN EN 61326-1
Elektrische Mess-, Steuer-, Regel- und Laborgeräte - EMV-Anforderungen - Teil 1: Allgemeine
Anforderungen (IEC 61326-1:2012)
DIN EN 61010-1
Sicherheitsbestimmungen für elektrische Mess-, Steuer-, Regel- und Laborgeräte - Teil 1:
Allgemeine Anforderungen (IEC 61010-1:2010 + Cor. :2011)
Funktion / Function:
Technische Leitung / Director Technology
Weitere angewandte technische Spezifikationen (nicht im EU-Amtsblatt veröffentlicht) / Further applied technical specifications (not published in the Official Journal of the EU)
Diese Erklärung wird verantwortlich für den Hersteller oder seinem Bevollmächtigten / This declaration is made for and on behalf of the manufacturer or his representatives
Tintometer GmbH
Schleefstr. 8-12, 44287 Dortmund, Germany
abgegeben durch / declared by
Name, Vorname / First name:
Dr. Grabert, Elmar
Diese Erklärung bescheinigt die Übereinstimmung mit den so genannten Harmonisierungsrechtsvorschriften, beinhaltet jedoch keine Zusicherung von Eigenschaften. / This declaration certifies
the conformity to the specified directives but contains no assurance of properties.
Zusatzangaben / Additional details:
Diese Erklärung gilt für alle Exemplare, die nach den entsprechenden Fertigungszeichnungen - die Bestandteil der technischen Unterlagen sind - hergestellt werden. Weitere Angaben über die Einhaltung obiger Fundstellen enthält die beigefügte
Konformitätsaussage unterstützende Begleitdokumentation. / This statement is valid for all copies which were manufactured in accordance with the technical drawings which are part of the technical documentation. More details about compliance of the
above mentioned references includes the supporting documentation.
Bevollmächtigte Person im Sinne des Anhangs II Nr. 1. A. Nr. 2, 2006/42/EG für die Zusammenstellung der technischen Unterlagen / Authorized person for compilation of
technical documents on behalf of Annex II No. 1. A. No. 2, 2006/42/EC:
Corinna Meier
c/o Tintometer GmbH, Schleefstr. 8-12, 44287 Dortmund
Ort, Datum / Place and date of issue
14
RD 125_7b 01/2020
Content
1. RD 125 ................................................15
1.1 Introduction .............................................15
1.1.1 Preface .................................................15
1.1.2 Guide to symbols .........................................15
1.2 Important information...................................... 16
1.3 Unpacking ..............................................17
1.4 Connecting..............................................17
1.5 Buttons.................................................18
1.6 Function of buttons........................................ 18
2. Work session ........................................... 19
3. Beeper ................................................19
4. Function schematics .....................................20
5. Maintenance ...........................................21
6. Cleaning ...............................................21
7. Technical data ..........................................21
8. Wiring diagramm .......................................22
9. Error code (LED indication) ................................23
Important Information
To Preserve, Protect and Improve the Quality of the Environment
Disposal of Electrical Equipment in the European Union
Because of the European Directive 2012/19/EU your electrical instrument must not be
disposed of with normal household waste!
Tintometer GmbH will dispose of your electrical instrument in a professional and envi-
ronmentally responsible manner. This service, excluding the cost of trans-
portation is free of charge. This service only applies to electrical instruments
purchased after 13th August 2005. Send your electrical Tintometer instruments
for disposal freight prepaid to your supplier.
15
RD 125_7b 01/2020
1. RD 125
1.1 Introduction
Please read the manual before using the unit in particular taking note of the warning
symbols listed below.
The manufacture does not take responsibility for any issues caused by use of the unit
not in accordance with the instructions laid out in this manual.
1.1.1 Preface
The reactor is only suitable for 16 mm Ø test tubes, closed with a lid.
The unit has a transparent cover, which has to be closed during the heating process.
The required temperatures and the corresponding time periods are specific for the
different test tube types and specified in the corresponding method descriptions.
Don’t exceed temperatures or time spans in any case.
All warning labels must NOT be removed and should be replaced if they become
damaged or faded.
1.1.2 Guide to symbols
The symbols below are used in this manual to indicate where there is risk of injury or
damaging devices or to indicate especially useful information:
DANGER!
Indicates risk of injury.
When not following instructions, severe injury or death may result.
ATTENTION!
Indicates possible damage to devices.
When not following instructions, devices may be heavily damaged.
IMPORTANT!
Indicates hints on operation and other useful information.
ATTENTION!
Hot surfaces! Do not touch, risk to be badly burned!
Read all instructions before using the instrument.
i
16
RD 125_7b 01/2020
1.2 Important information
Note on reactor placement
The setup location must not be extremely hot, cold, humid or dusty. Heat and cold
can impair the functionality of the reactor. Humidity and dust can cause the reactor
to fail.
Do not place the reactor near heaters such as radiators or the like. Do not expose the
reactor to mechanical vibrations or jarring.
Do not block or cover the ventilation openings.
Notes on power connection
Only use the power cord designated for use in your country.
The wall outlet should be within easy reach.
Pulling the power plug is the only way to disconnect the reactor from the power
source
Safety instructions for operation
The power cord must not be damaged. Do not place any objects on the power cord
and make sure it does not have any knots. To unplug the cord, always pull on the
plug and not on the cable itself.
Avoid covering the ventilation slots. Air circulation is necessary to prevent the reactor
from overheating. If the air circulation is restricted it could cause fire or damage the
reactor.
Never open the reactor housing yourself. There is a danger of electric shock
and other hazards. The reactor may only be opened and serviced by qualified
professionals.
Safety rules
The heating block if programmed, may reach a temperature of 150 °C, this hap-
pens during the heating phase when the red LED is lighted. Please note the unit will
remain hot during the cooling phase even though the LED-light may be off.
During this phase the base of the instrument may be very hot!
Do not touch, risk to be badly burned!
The materials used during the work must be compatible with the temperatures
reached by the unit.
Cleaning
The heating plate must be allowed to cool before cleaning.
Use a damp cloth with a non flammable, non corrosive detergent .
Personal Protection Equipment
The equipment used for personal protection must be compatible with the reached
temperature and the dangers due to the working materials.
i
17
RD 125_7b 01/2020
1.3 Unpacking
Carefully inspect all items to ensure that every part on the list below is present
and no visible damage has occurred during transportation.
Store the packing material to return the unit for repair or other kinds of transport.
The table below shows the parts included in the packing.
Part list
Part Quantity
1 Thermoreactor RD 125 1
2 Power cord (European version) 1
3 Instruction manual 1
1.4 Connecting
On the reverse side of the reactor:
• Selector for voltage 115 V / 230 V
• Plug for power cord
• Fuse 4 AT
• ON/OFF Switch (0/I)
Before connecting to power supply check that the ON/OFF switch is turned to “0”
and check that the voltage selector (115 V/230 V) corresponds to the voltage
supplied by the electric socket.
Selector
for voltage
ON/OFF Switch
Plug for power cord
Fuse
Cover
18
RD 125_7b 01/2020
1.6 Function of buttons
Start key (for timer): By pressing this key the work cycle will start with the
pre-selected values for temperature and time. At the end of the work cycle the
beeper will sound (Beeper, see page 19) and the heater automatically switches off.
Heat key: By pressing this key (after switching the instrument on using the main on/
off switch) the reactor will heat up to the pre-selected temperature.
Temp key: By pressing this key the temperature is selected (scrolling). It is possible
to select between 100/120 and 150 °C. When a temperature is selected the
corresponding LED will light.
Time key: By pressing this key the time is selected (scrolling). It is possible to select
between: 30/60/120 min or
(infinite). When a time is selected the corresponding
LED will light.
12 5
R
Start key / Timer
Heat key
Temperature key
Time (interval) key
Heat LED
Temperature LEDs
Time LEDs
1.5 Buttons
19
RD 125_7b 01/2020
2. Work session
This section describes the use of the reactor for a standard application.
For further applications please refer to “Function schematics” (see page 20).
After the unit is switched on (main switch, reverse side, position I) the keypad
automatically shows the last selected temperature and time span.
The corresponding LEDs are lighted.
After switching on the block heating does not commence automatically.
For heating up the unit press the “Heat” key.
After pressing this key the Heat LED is lighted.
Before and after pressing the “Heat” key temperature and time span still can be
changed.
During heating up the Temperature LED will light intermediately, when the selected
temperature is reached the Temperature LED is lighted permanently.
By pressing the “Start” key the timer starts the work cycles corresponding to the cho-
sen time span (indication by Time LED). Starting the work cycle the Time LED changes
from lighted to flashing.
When the work cycle ends Time LED and Temperature LED are lighted while the Heat
LED is off.
At the end of the work cycle the heater is switched off.
3. Beeper
Select temperature or time: short double beep
(two frequencies)
Switch heater on: long beep (one frequency)
Switch heater off: long beep (one frequency)
Temperature reaches the selected value: 8 x short beep
(two frequencies)
Start of countdown: long beep (one frequency)
End of countdown: 16 x short beep
(two frequencies)
Pressing a key which is inactive short beep
(at the moment): (one frequency)
Malfunction: Continuous beep (2 frequencies)
until the instruments is switched
off with the main switch
(position “O”). In this case the LED
combination according pages 23
allows a failure definition.
20
RD 125_7b 01/2020
4. Function schematics
After switching on the instrument with the main on/off switch, the heater is not active. Press the HEAT-key for heating up (status 1).
After heating up to the selected temperature the timer starts after pressing START-key (status 3).
Status Heat-LED Temp.-LED Time-LED Heat-key Start-key
Temp-/Time-
key
Heater
next possible
status
1. Waiting for
pressing HEAT-key
Off
last selected
temperature
last selected
time-span
Press: =>
Status 2
Ignore
Selection
possible
Off
After pressing
HEAT-key:
Status 2
2. Heating up On Flashing On
Press =>
Status 1
Ignore
Selection
possible
Heating up
or Cooling
down
If selected
temperature is
reached:
Status 3
3. Waiting for
pressing START-key
On On On
Press =>
Status 1
Press for t =
30, 60, 120
Selection
possible
Temperature-
controlled for
stability of
the selected
temperature
After pressing
Start-key:
Status 4
(t≠∞)
Ignore for
t=
If selected
temperature will
be changed:
Status 2
If temperature
to different to
selected one:
Status 2
4. Time: Count
down
On On Flashing
Press =>
Status 1
Ignore Ignore
Stable
Temperature
End of count
down:
Status 1
Heat-LED On: Heating up or stabilizing selected temperature.
Off: Heater is off
Temp.-LED Flashing: Selected temperature is not reached (heating up or cooling down)
Together with HEAT-LED On: Selected temperature is reached
Together with HEAT-LED Off: Indicates selected temperature without indication of the real temperature of the reactor
Time-LED Flashing: Count down function
On: indication of selected time-span without count down function.
21
RD 125_7b 01/2020
5. Maintenance
The unit is protected by a 4AT fuse. The position of the fuse holder is on the reverse
side of the unit under the main switch.
Should the fuse need changing, disconnect the unit from the power supply and open
the cover with a suitable tool to access the fuse.
6. Cleaning
No special maintenance is necessary apart from periodic cleaning of the unit.
Disconnect the unit from power supply and use a dust-free cloth with a non flamma-
ble, non aggressive detergent to clean the unit.
ATTENTION:
If the reactor is contaminated by spillage of the tube contents or breakage of the test
tube, the disposal of waste (both glass and liquid) must be done according to the
instructions set out in the Material Safety Data Sheet (MSDS).
A contaminated aluminium block must be replaced prior to further use of the reactor.
The reactor should be sent to the manufacturer or an authorised service centre.
7. Technical data
Power supply V/Hz 230 / 50-60 or
115 / 50-60 selectable
Power W 550
Size mm 248 x 219 x 171
Weight kg 3.9
Construction materials Housing: ABS
Protection grid: PPS
Lid: PC
Block insert: PBT
Heating block: Aluminium
Holes in the
aluminium block 24 holes, ø 16.2 mm ± 0.2 mm
Selectable temperatures °C 100 / 120 /150
Probe type Pt100 A class
Temperature stability °C ± 1
at the Pt100
Selected time min 30 / 60 / 120 / continuous (
)
Heating up from
(20 °C --> 150 °C) min 12
Thermoregulation Microprocessor
Protection °C at the Alublock for 190
against overheating
Beeper dB max. 88
Environmental conditions (operation)
Temperature °C 10 – 40
Humidity % max. 85
23
RD 125_7b 01/2020
9. Error Code (LED indication)
No. Error type Possible reason(s) Temp LED LED 30 min LED 60 min LED 120 min LED Continuous beep
1 Power supply frequency
Frequency higher/lower
50Hz / 60Hz;
Mainboard faulty
on off off off on yes
2 Safety feature reaction Mainboard faulty on off off on off yes
3 ADC error Mainboard faulty on off off on on yes
4 Wiring problem
internal connection
incomplete
on off on off off yes
5 Heating problem
- no power;
- reactor power
- probe problem
on off on off on yes
6 T value underrange Mainboard faulty on off on on off yes
7 T value overrange Mainboard faulty on off on on on yes
8 Temperature too high
Probe connection faulty
Mainboard faulty
on on off off off yes
9 Microprocessor failure EMC-interference
100° on
120° off
150° on
on off on off no
10
Temperature on
mainboard too high
Unit overheated on on on off off yes
Technische Änderungen vorbehalten
Printed in Germany 01/20
No.: 00 38 61 05
Lovibond
®
und Tintometer
®
sind eingetragene Warenzeichen
der Tintometer Firmengruppe
Tintometer China
Room 1001, China Life Tower
16 Chaoyangmenwai Avenue,
Beijing, 100020
Tel.: +86 10 85251111 App. 330
Fax: +86 10 85251001
chinaoffice@tintometer.com
www.lovibond.com
China
Tintometer South East Asia
Unit B-3-12, BBT One Boulevard,
Lebuh Nilam 2, Bandar Bukit Tinggi,
Klang, 41200, Selangor D.E
Tel.: +60 (0)3 3325 2285/6
Fax: +60 (0)3 3325 2287
lovibond.asia@tintometer.com
www.lovibond.com
Malaysia
Tintometer GmbH
Lovibond
®
Water Testing Schleef-
straße 8-12
44287 Dortmund
Tel.: +49 (0)231/94510-0
Fax: +49 (0)231/94510-20 sales@
tintometer.de
www.lovibond.com
Deutschland
Tintometer AG
Hauptstraße 2
5212 Hausen AG
Tel.: +41 (0)56/4422829
Fax: +41 (0)56/4424121
info@tintometer.ch
www.tintometer.ch
Schweiz
The Tintometer Ltd
Lovibond
®
House
Sun Rise Way
Amesbury
Salisbury
SP4 7GR
Tel.: +44 (0)1980 664800
Fax: +44 (0)1980 625412
sales@tintometer.com
www.lovibond.com
UK
Tintometer Inc.
6456 Parkland Drive
Sarasota, FL 34243
Tel: 941.756.6410
Fax: 941.727.9654
sales@tintometer.us
www.lovibond.com
USA
Tintometer Brasilien
Caixa Postal: 271
CEP: 13201-970
Jundiaí – SP -
Tel.: +55 (11) 3230-6410
sales@tintometer.com.br
www.lovibond.com.br
Brasilien
Tintometer Indien Pvt. Ltd.
Door No: 7-2-C-14, 2nd, 3rd & 4th Floor
Sanathnagar Industrial Estate,
Hyderabad, 500018
Telangana
Tel: +91 (0) 40 23883300
Toll Free: 1 800 599 3891/ 3892
indiaoffice@tintometer.com
www.lovibondwater.in
Indien
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56

Lovibond Thermoreactor RD 125 Owner's manual

Category
Space heaters
Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI