Best-Rite Porcelain Steel Markerboard

MyBinding Best-Rite Porcelain Steel Markerboard, Best-Rite Black Splash-Cork Eco Friendly Bulletin Board, Best-Rite Splash Cork Bulletin Board Assembly Instruction

  • Hello! I am an AI chatbot trained to assist you with the MyBinding Best-Rite Porcelain Steel Markerboard Assembly Instruction. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
3/4
Determine board location. Measure from floor to
the top edge of board. Mark with pencil line the
corner location. Measure down from top edge of
board 3/4”, and draw line as shown. Locate stud
near each end of board and drill pilot hole along line
using 1/8” drill bit.
Lift, Tilt, and Slide
Board down over the
Z-Hangers.
Z-Hangers should
catch in the top trim on
the back of the board.
Draw line along
bottom edge of board.
Secure board to bottom
brackets (F) using 2 short
screws (B) as shown.
Attach Z-Hangers (E) using Long Screws (A)
as shown.
Board Location
Board Location
Top Edge
of Board
Wall Stud
Draw line
Z Brackets hang in
the trim on back of
board
1
1
8
Lift and remove board from the Z-Hangers.
Measure up from bottom line of board 1-1/8”, and
draw line as shown. Locate stud near each end of
board and drill pilot hole along line using 1/8” drill bit.
Draw line
Board Location
Bottom Edge
of Board
Drill Hole
Secure 2 bottom brackets (F) to the wall using 2
long screws (A) as shown.
Hang board on the Z-Hangers (E).
Hardware List
A Long Screw
B Short Screw
C Screw Anchor - Concrete
D Screw Anchor - Drywall
E Z Hanging Bracket
F Bottom Bracket
P1 Board
Parts List
Z Clip Install_05-29-13
(For Drywall)
(For Concrete walls)
E
A
P-1
P-1
F
A
P-1
B
F
Markerboard/Tackboard
Z Clip Install
Note:
Install Masonry Anchors (D) into 1/4”
Diameter predrill holes for masonry
walls.
Install Drywall Anchors (E) into 1/4”
Diameter predrill holes for sheet rock
walls.
E
D
1.
2.
3.
4.
5.
6.
/