Gronomics MFPB 18-48 BG Installation guide

Type
Installation guide
WWW.gronomics.com East Bethel, MN USA
763-753-7374
Maintenance Free Planter Box (18” x 48”)
Assembly Instruction
Continued
Parts List
ITEM QTY. PART # DESCRIPTION
1 4 MF2000 Corner Post, 4" x 4" x 20"
22 MF4152 Side Rail w/ Cleat, 41.5" x 8.25" x 1"
31 MF4150L Side Rail w/ Logo 41.5" x 8.25" x 1"
41 MF4150 Side Rail, 41.5' x 8.25" x 1"
54 MF1200 Side Rail, 12" x 8.25" x 1"
65 MF1300 Bottom Board 13" x 5-3/4" x 3/4"
72MF1300N Corner Notched Bottom Board 13" x 5-3/4" x 3/4"
81 FL3652 Fabric Liner
94 MF4040 Post Cap, 4" x 4" x 1-1/2"
10 8 LP1700 Locking Pin 16"-L
Stack matching pieces in piles. Using the parts list,
locate and count the individual pieces and verify that
you have received the correct number of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: It is recommended to place a protective layer
between the ground and the pieces during assembly.
This will help prevent damage to the pieces.
NOTE: Ground preparation is optional, however we
recommend leveling area under frame of product, or
place product directly on a flat level surface before
filling with soil.
Parts Identification
Item #: MFPB 18-48
1
1
2
3
5
9
7
6
10
8
4
Packaged & Inspected by: Date:
Side Rail w/Cleat Assembly
2
Stand one 4” x 4” x 20” corner post (Item 1)
upright with slots facing you and slots facing to
the right.
Locate a 41.5" x 8.25" x 1" side rail w/cleat (Item
2). With the cleat located at the bottom and
facing you, install side rail w/cleat into the lower
slot and push inward until the lock pin hole of the
side rail w/cleat is inside the corner post.
2
Lower Slot
Cleat
1
Edit 8/30/2016
WWW.gronomics.com East Bethel, MN USA 763-753-7374
Continued
Install the Side Rail w/ Logo 41.5" x 8.25" x 1" (Item 3)
(w/Logo facing away from you) onto the top of side rail
w/cleat.
Slide the side rail w/Logo into the slot on the corner
post until the lock pin hole of the side rail w/Logo is
inside the corner post. Install locking pin (Item 10)
through the locking pin hole of the side rail w/Logo and
the side rail w/cleat.
Side Rail Assembly
3
3
Logo Facing Away
10
Align the 4” x 4” x 20” corner post (Item 1) with slots
facing you and slots facing the ends of the 41.5" x 8.25"
x 1" side rail w/ cleat (Item 2) and 41.5" x 8.25" x 1"
side rail w/Logo (Item 3).
Slide the corner post onto the side rails until the lock
pin hole of the side rail w/Logo is inside the corner post.
Install locking pin through the locking pin hole of the
side rail w/Logo and the side rail w/cleat.
Repeat steps 1 - 4 for the two remaining 4” x 4x 20”
corner posts, 41.5" x 8.25" x 1" side rail w/cleat and
41.5" x 8.25" x 1" side rail.
Side Rail Assembly Continued
4
3
1
2
Align two 12" x 8.25" x 1" side rails (Item 5) to the 4” x
4” x 20” corner post slots.
Slide the side rails into the corner post slots until the
lock pin hole of the side rail is inside the corner post.
Install locking pin through the locking pin hole of the
side rails.
End Rail Assembly
5
5
5
Align the other side rail assembly (as shown).
Align the corner post (Item 1) slots to the 12" x 8.25" x
1" side rails (Item 5).
Slide the side rails into the corner post slots until the
lock pin hole of the side rail is inside the corner post.
Install locking pin through the locking pin hole of the
side rails.
End Rail / Side Rail Assembly
6
1
Side Rail Assembly
5
WWW.gronomics.com East Bethel, MN USA 763-753-7374
Place the two remaining 12" x 8.25" x 1" side rails (Item
5) together and place between the two 4” x 4” x 20”
corner posts (Item 1).
Slide the side rails into the corner post slots until the
lock pin holes of the side rails are inside the corner
posts. Install locking pin through the locking pin hole of
the side rails.
Final End And Side Rail Assembly
7
1
5
1
Place one 13" x 5-3/4" x 3/4" corner notched bottom
board (Item 7) on each end of the garden bed.
Corner Notched Bottom Board Assembly
8
7
Place five 13" x 5-3/4" x 3/4" bottom boards (Item 6)
into the garden bed.
(Gap boards evenly to allow for water drainage).
Install the 4” x 4” x 1-1/2” post caps (Item 9) onto the
corner posts.
Place fabric liner (Item 8) into the garden bed.
Bottom Board And Post Cap Assembly
9
6
9
9
9
Completed Assembly
10
WWW.gronomics.com East Bethel, MN USA 763-753-7374
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Gronomics MFPB 18-48 BG Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI