Speakman S-1183, S-1183-BN Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Speakman S-1183 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Instructions for Models:
S-1183
Need Help?
For additional assistance or service call:
SPEAKMAN Company
400 Anchor Mill Road
New Castle, DE 19720
PHONE: 800-537-2107
EMAIL: customerservice@speakmancompany.com
WEB: www.speakmancompany.com
92-S-1183-R2
Clean wall surface. Place Mounng Base,
on to valve, align mounng holes, and secure with
Mounng Screws.
What You Need To Know:
Tools:
Required:
*Adjustable
Wrench
*Groove Joint
Plier
*Phillips
Screwdriver
*Thread Seal Tape
Helpful:
*Supply Lines *Basin Wrench
*Pipe Wrench *Hacksaw *Tubing Cutter
*Utility Knife *Eye Protection
Important Notes:
Be sure to read instructions thoroughly before
beginning installation. Do not overtighten any
connections or damage may occur. This valve
has an operating range of 20-80 psi.
Safety Tips:
Cover your drain to prevent loss of parts.
Be sure to wear eye protection while cutting pipe.
Maintenance:
Your new Faucet is designed for years of
trouble-free performance. Keep it looking new by
cleaning it periodically with a soft cloth. Avoid
abrasive cleaners, steel wool and harsh chemicals
as these will dull the finish and void your warranty.
What You Need To Know:
Verify that the hole sizes and posions of
holes in the wall are correct.
Shower and / or handshower outlet hole:
1.25" diameter.
Valve access hole: 2" diameter.
Recommended valve depth to nished wall:
2.5" min. to 3.5" max.
Shut o water supply.
Be sure to posion the valve body correctly in wall.
The marking “S” should be facing upward
Wrap thread seal tape around all pipe threads in a
clockwise direcon.
Connect water supplies to valve body inlets.
Connect shower outlet pipe and / or
handshower outlet pipe to valve body.
Connect pipe elbow(not included) to the end
of the pipe.
2" Dia
1.25" Dia
Align Handle Assembly with connector and
Escutcheon. Keep Handle in a staonary vercal
posion as you thread Handle Hub on to
Mounng
Base. Tighten unl snug.
SUPPLY CONNECTION LAYOUT
1/2" NPT OUTLET
1/2" NPT OUTLET
1/2" NPT INLET
1
2
3
"S" MARKING TO FACE UP
X3
1
2
2
1
2
6
1
3
4
5
4.37''
[111.12mm]
2.77''
[70.48mm]
2.98''
[75.78mm]
2.75''
[69.85mm]
2.92''
[74.17mm]
2.5"-3.5"
[64.77mm-67.31mm]
RPG05-0897
RPG05-0939
RPG04-0435
1
3
4
5
6
PRODUCT DIMENSIONS
REPAIR PARTS
½” NPT OUTLET
½” NPT INLET
/