H3C S7508E-X Installation, Quick Start

Type
Installation, Quick Start
H3C S7508E-X Switch
Installation Quick Start
New H3C Technologies Co., Ltd.
http://www.h3c.com.hk
Document version: 6PW101-20170430
Copyright © 2014-2017, New H3C Technologies Co., Ltd. and its licensors
All rights reserved
No part of this manual may be reproduced or transmitted in any form or by any means without prior
written consent of New H3C Technologies Co., Ltd.
Trademarks
H3C, , H3CS, H3CIE, H3CNE, Aolynk, , H
3
Care, , IRF, NetPilot, Netflow,
SecEngine, SecPath, SecCenter, SecBlade, Comware, ITCMM and HUASAN are trademarks of New
H3C Technologies Co., Ltd.
All other trademarks that may be mentioned in this manual are the property of their respective owners
Notice
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.
Environmental protection
This product has been designed to comply with the environmental protection requirements. The storage,
use, and disposal of this product must meet the applicable national laws and regulations.
i
Contents
Installation quick start ·················································································································································· 1
Chassis views and technical specifications ···················································································································· 1
Chassis views ···························································································································································· 1
Technical specifications ··········································································································································· 1
Safety recommendations ·················································································································································· 2
Examining the installation site ········································································································································· 3
Installing the switch ··························································································································································· 3
Attaching the slide rails to the rack ························································································································ 3
Installing cage nuts ··················································································································································· 5
Installing the switch in the rack ······························································································································· 6
Grounding the switch ··············································································································································· 7
Installing FRUs ··························································································································································· 8
Installing a power module ······································································································································· 9
Connecting power cords ······································································································································ 10
Accessing the switch for the first time ·························································································································· 12
Connecting the console cable ······························································································································ 12
Setting terminal parameters ·································································································································· 12
Powering on the switch ········································································································································· 13
Obtaining documentation ············································································································································· 13
Index ··········································································································································································· 14
1
Installation quick start
This installation quick start provides basic instructions for installing an S7508E-X switch. For more
information about the technical specifications, see H3C S7508E-X Switch Installation Guide.
NOTE:
The figures in this installation quick start are for illustration only.
Chassis views and technical specifications
Chassis views
Figure 1 Front and rear panels
(1) LPU slots (2) MPU slots
(3) Power module slots (4) Fan tray slot
(5) Switching fabric module slots
Technical specifications
Table 1 Switch dimensions
Model Hei
g
ht Width
De
p
th
S7508E-X 620 mm (24.41 in) (14 RU) 440 mm (17.32 in) 660 mm (25.98 in)
1
2
5
4
1
3
2
Table 2 Power module specifications
Item
LSUM1AC1200
s
p
ecifications
LSUM1AC2500
s
p
ecifications
LSUM1DC2400
s
p
ecifications
Rated input
voltage range
100 VAC to 240 VAC @
50/60 Hz
100 VAC to 240 VAC @
50/60 Hz
–48 VDC to –60 VDC
Rated output
voltage
12 VDC 12 VDC 12 VDC
Maximum input
current
16 A 16 A 60 A
Maximum output
current
100 A
100 A (110 VAC)
208 A (220 VAC)
200 A
Maximum output
power
1200 W
1200 W (110 VAC)
2500 W (220 VAC)
2400 W
Quantity 1 to 6
Safety recommendations
To avoid equipment damage or bodily injury caused by improper use, read the following safety
recommendations before installation. Note that the recommendations do not cover every possible
hazardous condition.
To prevent ESD damage, always wear an ESD wrist strap and make sure it is reliably grounded
before you touch the switch, cards, or PCB.
Do not install the switch, FRUs, or power cords when the switch is powered on.
To avoid equipment damage or bodily injury, make sure the switch is reliably grounded before
powering on the switch.
To ensure good ventilation, install a blank filler panel in an unused slot.
Figure 2 Attaching an ESD wrist strap
3
Examining the installation site
The switch can only be used indoors. To make sure the switch operates correctly and prolong its service
lifetime, the installation site must meet the requirements for load-bearing, temperature, humidity,
cleanness, EMI, grounding power module, ventilation, and space. For more information, see H3C
S7508E-X Switch Installation Guide.
If you are to install the switch in an enclosed rack, make sure the rack meets the following requirements:
A minimum of 100 mm (3.94 in) distance between the front rack posts and the front door for
accommodating the cable management brackets.
A minimum of 710 mm (27.95 in) distance between the front rack posts and the rear door for
accommodating the chassis and card handles.
Installing the switch
Attaching the slide rails to the rack
1. Read the signs on the slide rails to identify the left and right slide rails and their front ends, as
shown in Table 3.
Table 3 Description f
or signs on the slide rails
Si
g
n Meanin
g
Remarks
F/L Front end of the left slide rail Mount this end to the front left rack post.
F/R Front end of the right slide rail Mount this end to the front right rack post.
2. Mark the installation position on the rack for the slide rails:
a. Make sure the top flange of a slide rail aligns with the middle of the narrower metal area
between holes in a rack post, as shown in Figure 3.
b. Eac
h rack post requires six screws to attach the slide rail. Mark only the uppermost and
lowermost holes.
c. Mark the square holes at the same height on the other three rack posts.
4
Figure 3 Determining the cage nut installation holes by using a slide rail
(1) Middle of the narrower metal area between holes
3. Install six cage nuts in the square holes in each rack post, as shown in Figure 4.
Figure 4 Installing a cage nut
4. Align the installation holes on the front end of a slide rail with the cage nuts on a front rack post,
and use six screws to attach the slide rail to the front rack post. Figure 5 us
es the right slide rail as
an example.
1
2
5
Figure 5 Attaching the right slide rail to the front right rack post
5. Keep the slide rail horizontal and adjust its length until the installation holes on the rear end of the
slide rail touch the cage nuts on the rear rack post. Then use screws to attach the slide rail to the
rear rack post.
6. Repeat steps 4 and 5 to install the other slide rail. Make sure the two slide rails are at the same
height so that the switch can be placed on them horizontally.
Installing cage nuts
1. Determine and mark the cage nut installation holes in either of the following methods:
{ Mark the cage nut installation holes as shown in Figure 6.
{ Use other tools such as a tape. Align the tape with a mounting bracket. Mark the tape
according to the cage nut installation holes on the mounting bracket. Align the tape with the
rack posts and mark the installation holes on the rack posts.
6
Figure 6 Cage nut installation holes
Figure 7 Marking the cage nut installation holes
2. Install the cage nuts in the marked square holes on the rack posts.
Installing the switch in the rack
Follow these guidelines when you install the switch in the rack:
To avoid equipment damage or bodily injury, use a minimum of two people to lift the switch. H3C
recommends that you use a mechanical lift to move the switch.
Do not hold the filler panels, filler panel handles, or the air vents of chassis to carry the chassis. Any
attempt to carry the switch with these parts might cause equipment damage or even bodily injury.
After placing the switch on the slide rails, do not leave go of your hands immediately because this
might tip the switch. Tipping the switch can cause switch damage and even bodily injury.
7
Figure 8 Installing the switch in the rack
Grounding the switch
CAUTION:
Use the provided grounding cable (yellow-green grounding cable).
Connect the
g
roundin
g
cable to the
g
roundin
g
system in the equipment room. Do not connect it to a fire
main or lightning rod.
8
Figure 9 Grounding the switch
Installing FRUs
Installing a card
CAUTION:
Before installing a card in the chassis, make sure the connectors on the card are not broken or blocked.
9
Figure 10 Installing a card
Installing a power module
CAUTION:
Provide a circuit breaker for each power module and verify that the circuit breaker is off before
installation.
Do not install power modules of different models on the same switch.
To avoid power module damage, move the power module by supporting its bottom instead of holdin
its
handle.
After you push the power module into the slot, press the power module handle inward until it is secured
in place, and then fasten the captive screws on the power module.
10
Figure 11 Installing a power module
Connecting power cords
Connecting an AC power cord
CAUTION:
Before you connect an AC power cord, make sure the circuit breaker for the power cord is switched off.
11
Figure 12 Connecting an AC power cord
Connecting a DC power cord
CAUTION:
Provide a circuit breaker for each DC power cord.
Before connecting the DC power cord, make sure the circuit breakers for both the positive (+) and
negative (-) lines are switched off.
Figure 13 Connecting a DC power cord
12
Accessing the switch for the first time
Connecting the console cable
The first time you access the switch you must use a console cable to connect a console terminal, for
example, a PC, to the console port on the switch.
To connect the console cable to the console port:
1. Connect the DB-9 connector of the console cable to the 9-core serial port on the terminal.
2. Connect the crimped RJ-45 connector of the console cable to the console port on the switch.
Figure 14 Connecting the console port to a PC
Setting terminal parameters
To configure and manage the switch, you must run terminal emulator program, HyperTerminal or PuTTY
on the configuration terminal. You can use the terminal emulator program to connect a network device,
a Telnet, or an SSH site. For more information about the terminal emulator programs, see the user guides
for these programs.
The following are the required terminal settings:
Bits per second—9600.
Data bits—8.
13
Stop bits—1.
Parity—None.
Flow control—None.
Powering on the switch
1. Make sure the power cords are connected correctly to the power source, and the power source is
supplying power correctly.
2. Turn on the circuit breakers for the power modules.
3. Power on the switch.
4. Verify that the LEDs on the switch are in the states as described Table 4. For more information
about the LED
s, see H3C S7508E-X Switch Installation Guide.
Table 4 LED status when the switching is operating correctly
Card LED
Status
MPU
LINK Steady on
ACT Flashing or off
OK Steady on
FAIL Off
RUN Flashing
ALM Flashing or off
Switching fabric module
RUN Flashing or steady on
ALM Off
Power module
Power input Steady green
Power output Steady green
Fan tray
OK Steady on
FAIL Off
Obtaining documentation
Take the following steps to get related documents from the H3C website at www.h3c.com.hk.
1. Go to http://www.h3c.com.hk/Technical_Documents
.
2. Choose the desired product category and model.
14
Index
A C E I O S
A
Accessing the switch for the first time,12
C
C
hassis views and technical specifications,1
E
Ex
amining the installation site,3
I
Inst
alling the switch,3
O
Obt
aining documentation,13
S
S
afety recommendations,2
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17

H3C S7508E-X Installation, Quick Start

Type
Installation, Quick Start

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI