Gibraltar Building Products JACK6BRN Installation guide

Type
Installation guide

This manual is also suitable for

TOTAL JACK™
ADJUSTABLE PITCH
PIPE FLASHING
INSTALLATION GUIDELINES
1. Set TOTAL JACK™ down, flat on the surface of the roof, next
to the pipe you are ventilating. Twist the stack (a) in either
direction to achieve a vertical, upright position. Rotate the
octagonal base flange (b) to fine tune the stack position.
2. Place TOTAL JACK™ over the pipe (a). Adjust base and stack,
if necessary. Rotate the cap (b) to align it with the shingles.
3. Secure octagonal flange with fasteners and caulking as
approved by your local building code. Install remaining shingles in
accordance with manufacturer's specification
CAUTION! Working above grade is inherently
dangerous, be sure that proper fall protection
measures are in place. When working with
power tools, gloves and eye protection are
absolutely required.
For more information and installation video visit: www.totalroofjack.com
These installation guidelines are for use with typical or
standard applications. It is always recommended to seek
advice from a licensed professional, and to check with
your local building inspector or building permit office for
approvals and possible variations that may apply.
TOTAL JACK™ - is the only roof jack with an adjustable cap & turbine base.
  • Page 1 1

Gibraltar Building Products JACK6BRN Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI