COLORS Linear Lighting NNR25 Installation guide

Type
Installation guide
NNR25 Vertical ceiling mounted accessories
Installation Manual
V1.1
Single Ended
Double Ended
Please read this manual carefully before installation, and install the product in the correct way.
Please keep it after reading, so that all users of this product can check it at any time.
Prepare materials- Single Ended
Installation tools
Neon strip Manual PC tubeRubber plug
screw Metal
accessories
Countersunk
screw
End
capscrew Allen wrench
1000mm
2500mm
Two installation methods:
1. Straight outlet 2. Side outlet
1000mm
2500mm
5000mm
Neon strip can choose 1m, 2.5m, 5m
Electric screwdriver (head is ø6.0mm)
6.0mm
Prepare materials- Double Ended
Neon strip Manual Rubber plug
screw
Metal accessoriesCountersunk
screw
Allen wrench
The length of the neon strip and
PC tube 1m and 2.5m option
Phillips
screwdriver
Slotted
screwdriver
Pen Cutting Machine Tape measure
a 21
a
b
b 21
8
1 2
L
a 21
4
3
L-22mm
L-22mm
5 6
a 21
7
L-22mm
Installation Steps
910
11 12
15
13a
13b
a 21
14
Cement ceiling side outlet
Ceiling straight outlet
Fixed position
Installation Steps - Single Ended
Installation Steps - Double Ended
7
1
a 21 a 21
2
a
a
34
5 6
8
a 21
a
Fixed position
AS-NNR25VCC-1000
AS-NNR25VCC-2500
AS-NNR25VCC-XX-2
NNR25-XXCSN050CC0100
NNR25-XXCSN050CC0250
NNR25-XXCSN050CC0100
NNR25-XXCSN050CC0250
NNR25-XXCSN050CC0500
2M
2M
/
4kg
4kg
4kg
Side/ Top
Side/ Top
Side/ Top
Parameters
Code Adaptation modelWire length Load bearing Outlet
Tel:
E-mail:
Web:
Add:
+86-755-2923-1888
www.colorsled.com
Building A5, Qixing Wisdom Park, Shiyan Youth Road,
Bao’an District, Shenzhen, China
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6

COLORS Linear Lighting NNR25 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI