Pelco VMX200 User manual

  • Hello! I am an AI chatbot trained to assist you with the Pelco VMX200 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
®
Pelco World Headquarters • 3500 Pelco Way, Clovis, California 93612-5699 USA • www.pelco.com
USA & Canada: Tel: 800/289-9100 • Fax: 800/289-9150
International: Tel: 1-559/292-1981 • Fax: 1-559/348-1120
ADDENDUM
Addendum No.: C1525M-B-ADDEN
Date: March 5, 2003
Manual Affected: VMX200 Video Management System – C1525M-B
Manual Update: The following instructions replace the steps listed on page 11 of the Installation/Operation
manual for installing the VMX200 in a 19-inch equipment rack.
Refer to Figure 1 for the following instructions.
1. Attach the rack ears to the front sides of the VMX200 with the 10-32 x .250-inch screws.
2. Attach the brackets to the sides of the equipment with the 8-32 x .250-inch screws.
3. Fasten the front and rear support rails together with the 8-32 x .375-inch screws with lock
washers.
4. Attach the support rails to the equipment rack with the 10-32 x .375 inch screws.
5. Slide the brackets on the equipment onto the support rails.
6. Fasten the rack ears to the equipment rack with the 10-32 x .750-inch screws and washers.
Figure 1. Installation of Support Rails
/