ZIP System 5017114 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the ZIP System 5017114 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Guide to Loading and Unloading the
ZIP System
Tape Gun
Note: You can easily and effi ciently install the new linerless tape with your current ZIP System
Tape Gun.
There’s no need for new equipment. (See reverse side for details.)
TAPE GUN
Step 3. Push lever to lock tape roll into place.
Step 2. Place tape roll onto unwind spool so the
leading edge unwinds counterclockwise.
Step 5. Pull tape underneath pressure roller with
enough excess to begin applying to panel
seam. Pull tape gun to dispense. Pressure
roller imprint (diamond pattern) should be
observed on tape.
See reverse side for information on how to unload the
empty tape roll.
Step 1. Pull the lever inside the unwind spool prior
to loading tape roll.
Step 4. Feed leading edge underneath the bottom of
the take-up spool and toward pressure roller.
Linerless Tape Loading
© 2012 Huber Engineered Woods LLC. ZIP System and the accompanying ZIP System logo and design, are trademarks of Huber Engineered Woods LLC.
Huber is a registered trademark of J.M. Huber Corporation. Patents Pending. HUB-3048 04/12
To remove empty tape core, lift pull ring. Squeeze
thumb tabs while pulling the core away from the gun.
Tape Unloading
Guide to Loading and Unloading the ZIP System
Tape Gun
TAPE GUN
Step 2. Feed liner onto the take-up spool and close
liner clamp so it snaps shut.
Step 1. Follow Steps 1-3 on reverse side to load
tape roll, then open liner clamp and separate
approximately 4" of liner from tape roll.
Step 3. Feed tape over the top of the take-up spool
and under the pressure roller.
Tension Adjustment
If the tape gun requires too much pulling force to
dispense the tape, reduce tension by turning the tension
adjustment knob counterclockwise. If liner is not being
accumulated correctly, increase the tension by turning
it clockwise.
Lined Tape Loading
/