Unbranded Concentric Curb Transition, 547869, 547878 Installation guide

Type
Installation guide
INSTALLATION
INSTRUCTIONS
SUPERSEDES 10-26-04
SEPTEMBER 2, 2008
NEITRN07
Step 1:
Check for correct part number listed above:
Step 2:
Attach duct to transition duct connections.
Step 3:
Move the noted duct support to match the 33” dimension.
Step 4:
Install transition in supply/return opening in roof curb as shown so the duct work will line up with concentric diffusers.
The Concentric Curb Transition is designed to drop into the curb and convert the square duct unit connections to round
duct. For use with 547860, 547861, 547862, & 547863 roof curbs.
INSTALLATION INSTRUCTIONS FOR
547869 / 547878
CONCENTRIC CURB TRANSITION USED
WITH GR4GM 090-120 UNITS
FORM# 611A-0808 (611A-0298)
MODEL# DUCT SIZE
547869 20” ROUND
547878 18” X 28” RECTANGLE
ROOF CURB
*MOVE TO INSTALL TRANSITION
547878
18” x 28” DUCT CONNECTIONS
547869
20” ROUND DUCT CONNECTIONS
33
RETURN
SUPPLY
© Nortek Global HVAC
, LLC 2015. All Rights Reserved.
  • Page 1 1

Unbranded Concentric Curb Transition, 547869, 547878 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI