Installation Instructions
Homydom Lumber Storage Rack 3-level
Thank you for purchasing the Homydom Lumber Storage Rack.
This User Guide is intended to provide you with guidelines to
ensure that operation of this product is safe and does not pose risk
to the user.
Item
Qty
Description
!
Assembly Instructions
NOTE
Ensure your mounting location
is capable of withstanding the
additional load. Never overload
your rack.
1. Find studs, mark and pre-drill guide holes using
3/16" bit for long screw. Position the Space behind
the Long Screwand insert Screws into the hole. Place
the vertiacl bar over the stud and fasten to the wall.
(Make sure the level)
2. Slide the Horizontal Bar to the Vertical Bar,
secure with Hitch Pin & Clip.
Note: Featuring 6 adjustable holes in the middle
of the bar. You could place Horizontal Bar in
different locations to solve workshop storage
needs.
3. Continue Step 2 until all the bars are fitted.
Repeat this process for the other side.
Parts Checklist
A
B
C
D
E