Jacuzzi LNS6032ALR2XXW Installation guide

Type
Installation guide

This manual is also suitable for

Installation
English
www.jacuzzi.com Page 3
Important Safety Instructions
This is a professional grade product. A working knowledge of construction techniques, code-compliant plumbing/electrical
installation are required for proper installation and user satisfaction. We recommend that a licensed contractor perform the
installation of all Jacuzzi® products. Our warranty does not cover improper installation related problems.
READ AND FOLLOW ALL INSTRUCTIONS. SAVE THESE INSTRUCTIONS. Use this unit only for its intended use as
described in this manual. Do not use attachments not recommended by the manufacturer. Never drop or insert any object
into any opening.
DANGER: RISK OF ACCIDENTAL INJURY OR DROWNING! Do not permit children to use this unit unless
they are closely supervised at all times. Do not use hydromassage bathtubs unless all suction guards are installed to
prevent body and hair entrapment.
DANGER: RISK OF SEVERE INJURY FROM ELECTRIC SHOCK OR DEATH FROM ELECTROCUTION!
This unit must be connected only to a supply circuit that is protected by a 15 amp ground fault circuit interrupter (GFCI).
Such a GFCI should be provided by the installer and should be tested on a routine basis. Follow the manufacturer’s
instructions when testing the GFCI. The GFCI should interrupt power. Push the reset button. Power should be restored.
If the GFCI fails to operate in this manner, the GFCI is defective. If the GFCI interrupts power to the bathtub without
the test button being pushed, a ground current is owing, indicating a possibility of an electric shock. Do not use this
hydromassage bathtub. Disconnect the hydromassage bathtub and have the problem corrected by a qualied service
representative before using.
DANGER: RISK OF ELECTRIC SHOCK! Do not permit electrical appliances (such as a hair dryer, lamp,
telephone, radio or television) within 60” (1524 mm) of this hydromassage bathtub. Connect only to a circuit protected by
a ground fault circuit interrupter (GFCI). For permanently connected units, A green colored terminal or a wire connector
marked ("G", "GR", "GROUND", or "GROUNDING") is provided within the terminal compartment. To reduce the risk of
electric shock, connect the terminal or connector to the grounding terminal of your electric service or supply panel with a
conductor equivalent in size to the circuit conductors supplying the equipment.
WARNING: PROLONGED IMMERSION IN HOT WATER MAY INDUCE HYPERTHERMIA! Hyperthermia occurs
when the internal temperature of the body reaches a level several degrees above the normal body temperature of 98.6°F
(37°C). The symptoms of hyperthermia include an increase in the internal temperature of the body, dizziness, lethargy,
drowsiness and fainting. Water temperature in excess of 104°F (40°C) may be injurious to your health. Check and adjust
water temperature before use. The effects of hyperthermia include:
A. Failure to perceive heat.
B. Failure to recognize the need to exit the bath.
C. Unawareness of impending hazard.
D. Fetal damage in pregnant women.
E. Physical inability to exit the bath.
F. Unconsciousness resulting in danger of drowning.
DANGER! This equipment is intended for indoor use only. Install the equipment in accordance with these
instructions. Use supply wires that are suitable for 167°F (75°C), including the temperature rating of the supply conduc-
tors to be used. This unit should be electrically grounded and installed by a licensed contractor, electrician, and plumber.
Building materials and wiring should be routed away from the motor/pump or blower or other heat producing components
of this unit. A pressure wire connector is provided on the exterior of the motor/pump and heater to permit connection of an
No. 8 AWG solid copper bonding conductor between this unit and all other electric equipment and exposed metal in the
vicinity, as needed to comply with local requirements.
DANGER! RISK OF SEVERE INJURY OR DEATH! Risk of fetal injury. Pregnant or possibly pregnant women
should consult a physician before using a hydromassage bathtub equipped with a heater.
DANGER! RISK OF SEVERE INJURY OR DROWNING! Keep body and hair a minimum of 6" (152 mm) away
from the suction tting at all times when the hydromassage system is in operation. Hair longer than shoulder length should
be secured close to the head.
CAUTION! Do not immerse the control panel by overlling the bath.
Installation
English
Page 4 www.jacuzzi.com
Important Safety Instructions (Continued)
WARNING! RISK OF SEVERE INJURY! To avoid injury, use care when entering and exiting the hydromassage
bathtub
CAUTION! Do not use drugs or alcohol before or during the use of a hydromassage bathtub equipped with a heater.
People using medications or having an adverse medical history should consult a physician before using a hydromassage
bathtub equipped with a heater. Possible drowning may occur.
WARNING! RISK OF SEVERE INJURY OR DEATH! Do not use a hydromassage bathtub equipped with a heater
immediately following strenuous exercise.
CAUTION! TO DECREASE RISK OF PRODUCT DAMAGE. Use this unit only for its intended use as described in
this manual. Do not use attachments not recommended by the manufacturers. Do not tamper with user-operated controls
or such devices.
SAVE THESE INSTRUCTIONS.
Jacuzzi Luxury Bath (the “Company”) has obtained applicable code (standards) listings generally available on a national
basis for products of this type. It is the responsibility of the installer/owner to determine specic local code compliance
prior to installation of the product. The Company makes no representation or warranty regarding, and will not be respon-
sible for any code compliance. Product specications are subject to change without notice.
Visual Inspection
1. Remove the bathtub from the shipping carton. Be careful not to scratch the surface of the bathtub on exposed staples.
Remove the staples or fold them into the carton. Retain the carton until satisfactory inspection of the product has been
made. Do not lift the bathtub by the plumbing at any time; handle by the shell only.
2. Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the nish or visible
damage to any components, do not install the bathtub. Damage or defect to the nish claimed after the bathtub is
installed is excluded from the warranty. The responsibility of Jacuzzi Luxury Bath for shipping damage ceases upon
delivery of the products in good order to the carrier.
3. Refer any claims for damage to the carrier. For denitions of warranty coverage and limitations, refer to the published
warranty information packed with the product or in the back of this manual.
Bathtub Water and Operational Test
All bathtub units are factory tested for proper operation and watertight connections prior to shipping. However, the unit
must be retested by the installer prior to installation. Jacuzzi Luxury Bath is not responsible for any defect that could have
been discovered, repaired, or avoided by following this inspection and testing procedure:
1. Place the bathtub on a level surface, near appropriate electrical supply, water supply, and water drainage. A driveway
is a suitable choice.
2. Cover the drain and overow hole with tape or a stopper and ll the bathtub to the bottom of the overow hole.
3. Allow bathtub to stand for 5 minutes.
4. Plug in motor/pump and turn unit on. Conrm that all features function as described in the Operating Manual. Do not
install the bathtub if bathtub fails to operate as described.
5. Visually inspect all joints for leaks. Do not install the bathtub if leaks are detected.
6. Return bathtub to box or otherwise protect from damage until time of installation.
Inspection and Testing
Installation
English
www.jacuzzi.com Page 5
Framing and Support
READ ALL INSTALLATION INSTRUCTIONS COMPLETELY. IMPROPER INSTALLATION WILL VOID THE WARRANTY.
The oor structure beneath the bathtub must be able to support the total weight of the bathtub, water and bather. Consult
a structural engineer.
IMPORTANT!
Make sure that walls and oors meet re safety requirements of local building code and/or FHA/HUD Minimum Property
Standards.
Observe all governing codes and ordinances.
1. Proper installation is your responsibility. Have a qualied technician
install this bath.
2. Installation using a ground-fault circuit-interrupter (GFCI) is
required.
3. It is the customer’s responsibility:
• To contact a qualied electrical installer.
• To ensure that electrical installation is adequate and in
conformance with National Electrical Code (NEC).
The Technical Specications can be found at www.jacuzzi.com/baths/
support/.
Frame out the space where the bathtub is to be located. The follow-
ing should be taken into consideration when preparing the area:
Dimensions provided on rough-in diagrams are nominal.
Measure your actual unit upon receipt and build according to the
actual dimensions.
Finished alcove must have correct interior dimensions, as shown
in the key dimension section in the Technical Specications
Sheet, to properly install unit.
For three wall alcove installations, use an integral molded three-
sided tiling ange bathtub. When using the optional tile ange,
refer to instructions that are included with kit.
In remodeling, if necessary, add studs at each end to provide a
vertical nailing surface for the side nailing anges of bath xture
product.
To avoid obstructions during installation make sure that supply
lines, spout pipe and valve plumbing do not project into alcove.
Bathtubs require a 6" x 12" (150 mm x 305 mm) oor opening for the 1 ½" (38 mm) drain, waste and overow (DWO)
kit.
Be sure oor opening location matches bathtub xture drain location.
Use of casting plaster/plaster of paris (foundation material) is recommended
in all commercial structures (i.e. hotels, motels, dormitories, health clubs,
etc.).
The unit must be supported from the bottom of the bathtub and not from the
bathtub rim.
Per UPC code, access must be provided to the pump/motor for your specic model (Figure 1 and Figure 2).
Provide adequate ventilation for cooling and supply sufcient air for the pump/motor. Do not insulate around the
equipment.
It is the responsibility of the installer, building contractor or owner to provide access for service. Jacuzzi is not respon-
sible for any costs relating to obtaining access for repair. The owner shall bear such costs and, if appropriate, must
seek recovery from the installer.
Blower or
Pump Motor
Access
location
example
Access
location
example
A
B
Fig. 1
Blower or
Pump Motor
Access
Location
Examples
Access
Location
Examples
A
B
Fig. 2
A = Primary access (required)
B = Secondary access for equipment (optional)
Illustrations above shown with framing exposed
for clarity.
IMPORTANT: Left hand unit access is on the
opposite side (mirror)
Installation
English
Page 6 www.jacuzzi.com
Framing and Support (Continued)
Suboor
Prepare the suboor for the drain and ensure that the area is level.
1. The drain/overow of the bathtub extends below the bottom of the bathtub. The Technical Specications can be found
at www.jacuzzi.com/baths/support/.
2. Make appropriate cuts to the suboor to accommodate the drain.
3. The Jacuzzi Tru-Level® base is a standard feature on all bathtubs. If the suboor is level and a continuous surface, no
other preparation is necessary. Proceed to the “Electrical Connections” section.
4. If the suboor is not level, you must level the entire surface prior to installing the bathtub. The materials used will
insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar, plaster or
minimal expansion structural foam (having a density of a minimum 5 lbs/cubic foot). The bathtub must remain level in
order for it to drain properly and must make contact with the leveling material. Both sides of a joint or splice of suboor
should be level to each other.
Electrical Connections
DANGER: RISK OF ELECTRIC SHOCK! Connect only to a
circuit protected by a GFCI (Figure 3).
CAUTION! Electrical outlet must be mounted 4" (101 mm) above the oor
line and 12" max (305 mm) inside from the edge of the bathtub (Figure 3), or in
accordance with local building and electrical codes.
CAUTION! Risk of component overheat. Do not use electric extension
cord to power this unit. Operating the pump without enough water in the bathtub
can cause permanent damage to the pump/motor.
If the GFCI unit indicates a malfunction, per manufacturer’s instructions, turn
OFF power and do not attempt to use the bathtub until the source of the problem
has been identied and corrected.
NOTES: When using electrical products, basic precautions should always be
followed. Always follow local building and electrical codes. Grounding is required.
The unit should be installed and grounded by a qualied electrician.
CANADIAN MODELS ONLY: The components must be hard wired in the
J-Boxes (supplied) that are located on the unit.
The Technical Specications can be found at
www.jacuzzi.com/baths/support/.
Shown: Pure Air®
Bath
(101 mm)
12˝
(305 mm)
Fig. 3
(101 mm)
12˝
(305 mm)
Shown: Whirlpool w/
optional heater
Installation
English
www.jacuzzi.com Page 7
Assemble in accordance with the local plumbing or
building codes.
1. Identify drain overow kit provided with your bathtub.
Remove and open the overow package and conrm
that all parts are present.
2. Remove washers and nuts from the overow tting.
3. Place a small bead of plumbers putty, silicone, or
similar approved sealant around the underside of the
top ange of the overow tting.
4. Place the overow tting into the overow hole of the
bathtub (Figure 4).
5. From the underside of the unit, place the rubber washer
then locknut on the overow tting and tighten securely.
Be careful not to overtighten.
6. Assemble the remaining drain pieces as shown in the
illustration.
7. After the drain is fully installed, test for proper drainage.
If the unit does not drain properly, rectify this condition
before proceeding with further bathtub installation.
Watertight installation of the drain and overow
is the installer’s responsibility. Drain leakage is
excluded from the Jacuzzi Luxury Bath warranty of
this product.
OPTIONAL - If the Fuzion
®
Wood Frame is not
being used, please proceed to Step 2 in the
Undermount Installation section on page 11.
Fig. 4
Overow Fitting
Apply sealant/caulking
(commercially available)
Flat Rubber
Washer
Lock Nut
Direct Waste Overow Drain
Fuzion
®
Specic Material
Fuzion
®
Overow Drain Installation
Figure 4 - Overow Installation
The additional design features of the Fuzion
®
require that the following steps be completed prior to installing the bathtub
in the constructed surround. The following steps must also be completed in the order specied:
1. Fuzion
®
Faucet Installation
2. Fuzion
®
Overow/Drain Installation
3. Fuzion
®
Wood Frame Installation
4. Fuzion
®
Control Panel Installation
Fuzion
®
Faucet Installation
Selecting a faucet for rim mounting: The combined thickness at the rim of the bathtub shell and optional
wood deck is 2˝ (50mm) nominal. The length of the faucet tailpiece(s) must be long enough to extend past
this dimension and have ample clearance to assemble any hardware (i.e. locknut, water supply fittings, etc.)
necessary for installation. For undermount units, the combined thickness of the bathtub shell is ½˝ (12mm)
nominal and the undermount deck should not exceed the length of the faucet tailpiece(s), including any
assembly hardware.
Overow Drain
Assembly
Direct Waste
Overow Drain
Waste Elbow
Twist and Turn
Drain Assembly
PVC Pipe
PVC Pipe
PVC Flex Pipe
PVC Flex Pipe
PVC Flex Pipe
PVC 45 Elbow
PVC 45
Elbow Street
PVC 45 Elbow Street
PVC 45 Elbow
Installation
English
Page 8 www.jacuzzi.com
Fuzion
®
Frame Installation
If you are installing a Fuzion
®
bathtub with accessory
frame, please refer to the Fuzion
®
Frame Installation
Guide (#GL44000) before proceeding any further.
Complete the installation and assembly steps according
to the Fuzion
®
Frame Installation Guide.
Fuzion
®
Control Panel Installation
Fuzion
®
Frame
Control Box Wire
(Black Wire)
Control Panel
Adhesive Application
Control Panel
Control Box Wire
(Adhesive)
Inside of Bathtub
The following cutouts must be clear and free of any dirt
or adhesive:
- Control panel cutout in the assembled wood frame
- Control panel cutout in the assembled counter
- Control panel cutout in the bathtub
1. Insert the wire connector into the back of the control panel
(Figure 5).
2. Sparingly apply adhesive around the base of the control
panel (Figure 6).
3. Thread the wire through the cutout and to the control box.
4. Orient control panel in the following manner: the logo will
be on the right side of the J4 control panel when you are
sitting in the bathtub (the power button will be on the right
side of the J5 LCD control panel).
5. Lower the control panel into the cutout and press rmly to
embed the adhesive (Figure 7).
6. Connect the wire to the control box.
7. Please proceed to Step 3 in the Drop-In Installation
section on page 10.
Fig. 5
Fig. 6
Fig. 7
Fuzion
®
Specic Material (Continued)
Installation
English
www.jacuzzi.com Page 9
Chromatherapy Operation
If Chromatherapy fails to work:
Reset the GFCI.
Ensure the plug is fully in the outlet.
Ensure the connectors to the control panel and control box are fully engaged in receptacles.
Contact your electrician to ensure the proper wiring and power is being supplied to the GFCI.
Contact Jacuzzi Luxury Bath if the above does not resolve the issue.
Installation Procedures (All Models)
DANGER: Risk of electric shock! Turn off the power supply to the GFCI protected circuit.
Before you begin your installation, please read the following:
Observe all local and building codes.
Determine which tools will be used during the installation.
Additional bathtub drain parts and plumbing are commercially available at plumbing and hardware stores.
1. Install drain/overow according to the manufacturer’s instructions. Refer also to the Technical Specications Manual.
Watertight installation of the drain is the installer’s responsibility. Drain leakage is excluded from the Jacuzzi
Luxury Bath warranty of this product.
2. Install the faucet at this time (if applicable). It is recommended that the faucet be installed by a qualied plumber. See
special notes on freestanding section for faucetry.
Proper installation of the spout plumbing and compliance with local codes are the responsibility of the in-
staller. Jacuzzi Luxury Bath does not warrant connections of water supply ttings and piping, ll systems, or
drain/overow systems. Nor is it responsible for damage to the bathtub which may occur during installation.
A non-ammable protective barrier must be placed between the soldering work and the bathtub unit to pre-
vent damage to the bathtub.
CHROMATHERAPY
Press once to turn lights ON at
white level 2.
Press again to cycle colors.
Press again to stop at the current
color.
Press again to restart the cycle.
DECREASE TOGGLE
Press to decrease light intensity
all the way down to off.
NOTE: Default lighting color is
white level 2.
INCREASE TOGGLE
Press to increase light intensity.
Press to turn ON lights at last
color used from OFF.
NOTE: Default lighting color is
white level 2.
Installation
English
Page 10 www.jacuzzi.com
Installation Procedures (Continued)
3. Sufcient clearance must be provided for access to service connections (pump/motor, controls, heater plumbing and
electrical hook ups).
4. Bottom support materials: Casting plaster/plaster of paris (herein referred as foundation materials) are not necessary
but its use is highly recommended for a rmer bottom support. In a bucket, mix foundation material. Place a large
mound of plaster on the suboor, in the approximate location of the tub bottom center. The mounds should be placed
high enough so that when the tub is set, it will cause the plaster to displace and spread.
Drop-in Installation
1. Prepare the cut-out hole for the bathtub using either the provided full scale
template or the cut-out dimensions listed in the Technical Specications Manual
found on www.jacuzzi.com/baths/support.
The template may show guides for more than one bathtub. Be certain
to select the appropriate guidelines. If undermounting is an option, be
careful to select the guidelines that apply to the installation that you
are performing.
2. Complete all deck nish work and cover to protect from damage while placing
the bathtub.
3. Place a piece of scrap lumber on each of the ends of the cutout – this will be
used as a temporary support prior to lowering the bathtub fully into the opening
(Figure 8).
4. Install the unit. For units equipped with a motor/pump and/or a blower, insert the motor/pump end rst, lowering the
bathtub into the opening (Figure 9).
5. The bathtub must be set level. To check, use a level on top of the ledges on both ends of tub and on top of threshold
(Figure 10).
6. Turn on the power supply to the dedicated GFCI protected circuit and check system for operation.
7. Caulk around the perimeter of bathtub to seal the space between the rim and the nished deck (Figure 11).
Fig. 8
Scrap Lumber
Level
Fig. 10
Tile or
Finished
Surface
Support
Member
Level Subfloor
Minimum 3"
(76 mm)
Clearance
Substrate
Scrap
Lumber
Scrap
Lumber
Fig. 9
Flashing
Exploded View
1" x 4"
(25 mm x 101 mm)
Not For Support
Mortar or
Adhesive
Sealant
Tile
Subfloor
Fig. 11
Installation
English
www.jacuzzi.com Page 11
Installation Procedures (Continued)
Undermount Installation
1. Inspect all ttings, plumbing, and control lines after inserting to ensure the
components are not damaged or disconnected.
2. Align the bathtub and connect the drain.
3. Cut deck to t using the undermount template provided as follows:
Position the template so that the desired undermount guidelines are aligned with
the rim edge as shown.
Using a grease pencil, mark the center lines (denoted by
L
C
on template). Remove
template.
Measure the distance from the wall, or other xed point, to the center lines (Figure 12).
4. Afx counter to bathtub. Clean any dirt or debris from the top of the bathtub rim.
5. Turn on the power supply to the dedicated GFCI-protected circuits and check
system operation.
CAUTION! Do not use an adhesive or adhesive sealant to secure the
bathtub to the deck. If maintenance or remodeling is required, the deck
may have to be removed. Adhesive will permanently bond the bathtub to
the deck.
6. Apply a continuous bed of silicone sealant around the entire seam between the counter and the bathtub rim. Allow
sealant to cure according to manufacturer’s instructions (Figure 13).
3-Wall Alcove Installation
1. Make sure framed-in alcove is of proper size per Jacuzzi dimensions, square, and
plumb; check oor for levelness (Figure 14). Rough-in should be kept to a minimum
until the unit is on the job site. Measurements may vary +0 or -¼" from original
specications.
2. Place the tub in the alcove with the front skirt rmly on the oor. The bathtub must
be set level. To check, use a level on top of the ledges on both ends of tub and on
top of dam (Figure 15).
3. After leveling tub, mark each stud (concrete or block wall)
immediately above the back horizontal ange. Remove
tub from alcove. Measure the distance between the top of
the back horizontal ange and the bottom of the tub ledge
approximately 1½" (40 mm). Carefully mark this dimension
on the back studs (or wall), below the rst mark (Figure 15 -
inset).
4. Install a Ledger Strip: Jacuzzi mandates the use of supports
under the rear ledges of bathtubs to prevent shifting. Use
horizontal ledger strip along the entire rear ledge or “I”, “T”
supports in at least two places in vertical position. Nail a 1" x
3" (25 mm x 75 mm) ledger strip immediately below the lower
marks made on framing (Figure 15 - inset).
5. When fastening wood framing, pre-drill anges with a ⅛" (5
mm) carbide bit and fasten using #8 x 1-½" (38 mm) self-
tapping sheet metal screws; to concrete/block walls use 1" (25
mm) concrete nails with nailing tool or impact.
NOTE: Pre-drilling the nailing anges is recommended to avoid cracking of the acrylic unit. Silicone the top of each fas-
tener to insure water tightness.
Template
Counter
A
B
C
D
Fig. 12
Fig. 13
Template
Bathtub Rim
Seal with
silicone sealant
Level
Fig. 14
Top of
Ledger
Strip
Ledger
Board
1,50”
Fig. 15
Installation
English
Page 12 www.jacuzzi.com
Installation Procedures (Continued)
6. Spot-fasten the two bottom corners and the two top corners of the vertical side nailing ange.
7. Nail/fasten at each stud through the topside anges at each stud 16" (405 mm) on center, working from both ends
toward back center. Complete the fastening through vertical side ange, approximately 8" (205 mm) on center.
8. When other than cementitious backer board is to be used, furring strips
as thick as nailing anges are recommended for installation on studs
above the installed unit to assure walls will be ush. 100% silicone
sealant with mildew resistant properties should be applied between the
backer board and horizontal surface of unit (Figure 16). Then nished
wall materials can be applied.
WARNING! Finishing of other trades should be done
in conformance with applicable codes and generally accepted
building practices.
9. Turn on the power supply to the dedicated GFCI protected circuits and
check system operation.
10. Caulk around the perimeter of bathtub to seal the space between the
rim and the nished deck (Figure 16).
CAUTION! Apply a continuous bead of silicone sealant
around the entire seam between the counter and the bathtub rim.
Allow sealant to cure according to manufacturer’s instructions.
For Optional Tile Flange
1. Install the ange (purchased separately) according to the instructions
that are included with the kit. If the bathtub is equipped with an
integrated ange, refer to 3-wall alcove installtion on page 11.
2. Place the bathtub into the alcove. Screw the ange to the wood stud.
It may be necessary to shim the unit to close up any gaps between the
wood stud and the ange (Figure 17).
Bathtubs with Optional Skirt
1. Screw skirt anges into wall studs, Figure 18.
It may be necessary to shim the unit to close any gaps between wall
studs and the anges.
2. Complete nish work over skirt ange.
3. Caulk around the perimeter of the skirt to seal the space between the skirt and
the nished deck.
Surface Finish
Concrete Board
Silicone
Skirt
Fig. 16
Screw
Tile Flange
Silicon/Sealant
Bath Rim
Plastic Filler
Cement Board
Mortar
Stud Wall
1" x 4"
(not for support)
Finishing Material
Fig. 17
Fig. 18
Finishing
Materials
Caulking Bead
Skirt Panel
Mounting
Screws (as
viewed from
inside the
enclosure)
Installation
English
www.jacuzzi.com Page 13
Skirt Panel Installation (Select Skirt Models Only)
This skirt installation method is used for select bathtubs only. All other Comfort
Collection bathtubs utilize magnets to secure skirt panels.
To remove the skirt panel:
Grasp an edge of the skirt panel and pull to separate.
To reinstall the skirt panel (Figure 19):
Align the six posts on the panel with the six receptor sockets on the tub and
press into place.
Skirt Panel Adjustment (Figure 20):
Insert a standard screwdriver into the receptor socket through the slot at the
rear. Turn clockwise to tighten and counter-clockwise to loosen.
Cleanup After Installation
To avoid dulling and scratching the surface of the bathtub, never use abrasive cleaners. For most soiled surfaces, a mild
liquid detergent and warm water is sufcient. The following is also recommended:
Remove spilled plaster with a wood or plastic edge. Spots left by plaster or grout can be removed if lightly rubbed with
liquid detergent on a damp cloth or sponge. Do not use metal scrapers, wire brushes or other metal tools, as they will
damage the bathtub’s surface.
Paint, tar, or other difcult stains can be removed with Fantastik® or soapy water.
Minor scratches which do not penetrate the color nish can be removed by lightly sanding with 600-grit wet/dry sand-
paper. You can restore the glossy nish to the acrylic surface of the bathtub with a special compound, Meguiar’s #10
Mirror Glaze. If that is not available, use automotive rubbing compound followed by an application of automotive paste
wax.
Major scratches and gouges which penetrate the acrylic surface will require renishing. Call Jacuzzi Luxury Bath to
nd a service agent in your area.
General Cleaning
CAUTION! Do not use oil or oil-based bathtub additives. Never use abrasive or caustic household cleaners on
any Jacuzzi Luxury Bath product.
If you want to use any kind of bathtub additive, use only a small amount of low-foaming powder; the whirlpool action inten-
sies the foaming properties of soaps.
The use of certain bathtub oils, bubble baths, and bathtub additives may increase the level of accumulations of bathtub
residue in the whirlpool system and may cause false reading of the water level sensors. If excess accumulations persist,
you should discontinue use of these products.
To remove accumulations of bathtub residue from the whirlpool system, it is recommended that a bathtub be cleaned
regularly. For best results, however, we recommend that you clean your whirlpool bathtub after each use using Systems
Clean™, our exclusive two-part plumbing system cleaner made specically for whirlpool bathtubs. Systems Clean™ is
available through an authorized Jacuzzi Luxury Bath Distributor, by calling us direct at 1-800-288-4002, or may be pur-
chased online at www.jacuzzi.com.
Fig. 19
Receptor Socket
Post
Fig. 20
Interior View
Exterior View
Receptor Socket Slot
Installation
English
Page 14 www.jacuzzi.com
General Maintenance
To clean your bathtub, simply use a mild, nonabrasive liquid detergent solution. You can protect and restore the gloss to a
dulled acrylic surface by applying Meguiar’s #10 Mirror Glaze, a product specically designed for use on acrylic nishes. If
Meguiar’s is not available, use a ne grade automotive rubbing compound followed by an application of clear automotive
paste wax.
Minor scratches which do not penetrate the color nish can be removed by lightly sanding with 600-grit wet/dry sandpaper.
Restore the gloss using Meguiar’s Mirror Glaze or automotive paste wax. Major scratches and gouges which penetrate
the acrylic surface will require renishing. Call Jacuzzi Luxury Bath to nd a service agent in your area.
Authorized Service
If you need a referral for a service company near you, or need assistance with operation or maintenance-related ques-
tions, please call our Service Support Department at 1-800-288-4002. Visit our web site at http://www.jacuzzi.com/ for
products, services, and an online copy of these Installation and Operation Instructions.
When requesting service or technical assistance please have available both the model and serial number of your unit.
This information can be obtained from the product registration card provided with your unit. If the card has been mis-
placed, this information can be obtained from the specication/serial number label on the unit itself. The label is located on
the wall of the bathtub near the pump/motor.
SPECIFICATION/SERIAL NUMBER LABEL
PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
USE TECHNICAL SPECIFICATIONS MANUAL SUPPLIED WITH PRODUCT.
Jacuzzi Luxury Bath has obtained applicable code (standards) listings generally found online at www.jacuzzi.com/baths/
support. It is the responsibility of the installer/owner to determine specic local code compliance prior to installation of the
product. Jacuzzi Luxury Bath makes no representation or warranty regarding, and will not be responsible for any code
compliance.
Jacuzzi Luxury Bath
14525 Monte Vista Avenue
Chino, California, 91710
1-800-288-4002
www.jacuzzi.com
MODEL: XXXXXXX
NAME: XXXXX
COLOR: XXXXX
MFG#: XXXXX
SER#: XXXXXX
Appropriate Safety Compliance Logos for
your unit.
Applicable Electrical Specications for your unit.
Electrical specications printed in this area.
XXXX-XXXXX
Core Number,
Serial Number
You will nd your
serial number here
Jacuzzi Luxury Bath
14525 Monte Vista Avenue
Chino, California 91710
WARRANTY REGISTRATION CARD
Jacuzzi Luxury Bath
LG32000
Ninety-Day
Parts Only
Limited Warranty
On
Accessory(ies)
To complete your registration, visit our website at www.jacuzzi.com or ll out and mail this card to the address printed
on the other side within thirty (30) days from date of purchase in order for this warranty to become effective.
Purchaser’s Name ______________________________________________________________
Purchaser’s Address _____________________________________________________________
City ______________________________________ State _______________ Zip _____________
Home Phone ______________________________ Cell Phone:___________________________
Email: _____________________________________________________
Date of Purchase ____________________________________________
Model Name ________________________________________________
Serial Number _______________________________________________
Dealer’s Name ______________________________________________
Dealer’s Address ________________________________________________________________
1. How did you rst hear about this Jacuzzi® product?
( ) Advertisement ( ) Article in Magazine/Newspaper
( ) Visited Dealer/Plumbing Supplier ( ) Yellow Pages
( ) Builder/Plumber/Remodeler ( ) Decorator/Architect
( ) Visited Retailer/Home Center Store
( ) Word of Mouth . . . Friend/Relative/Acquaintance
( ) Other (Please Describe) _______________________________________________________
2. Who rst gave you specic information about this product (specications, prices, etc.)?
( ) Dealer/Plumbing Supplier ( ) Builder ( ) Remodeler
( ) Plumbing Contractor ( ) Retailer/Home Center Store
( ) Decorator/Architect ( ) Already Installed
3. What was the main reason for purchase?
( ) Styling ( ) Warranty Service ( ) Product Features
( ) Brand Name ( ) Price ( ) Hydrotherapy
( ) Home Resale _______________________ _________________________________________
( ) Other ______________________________________________________________________
4. Who nally decided which product you would buy?
( ) Self ( ) Spouse ( ) Self and Spouse Together
( ) Other Family Member ( ) Designer/Architect
( ) Builder/Plumber/Remodeler ( ) Already Installed
5. Who installed? ( ) Already installed/New Home
( ) Contractor/Plumber when remodeling
( ) Self/Spouse when remodeling
( ) Other ______________________________________________________________________
6. What is the current market value of this property?
Please estimate $ ______________________________________________________________
7. What is the age of the head of the household? Years
8. What other manufacturers did you consider?
( ) Eljer ( ) Aquatic Bath ( ) Price Pster ( ) Aqua Glass
( ) Kohler ( ) American Standard ( ) Sterling
( ) Other (Specify) _______________________________________________________________
9. How long did you shop before purchasing unit?
( ) 1 day ( ) 2 months- 6 months
( ) 2-7 days ( ) 6 months- 1 year
( ) 1 week- 2 weeks ( ) 1 year- 2 years
( ) 2 weeks- 4 weeks ( ) +2 years
( ) 1 month- 2 months
10. Approximately how long have you lived in this home _____________________ ?
11. Please indicate, approximately, the total annual income of your household.
( ) Up to $24,999 ( ) $50,000 to $74,999
( ) $25,000 to $29,999 ( ) $75,000 to $99,999
( ) $30,000 to $39,999 ( ) $100,000 to $149,999
( ) $40,000 to $49,999 ( ) $150,000 and Above
12. Was your purchase process?
( ) Very easy ( ) Easy ( ) Difcult ( ) Very Difcult
13. How technically aware were you of the patented Jacuzzi® jet system prior to your purchase?
( ) Not aware ( ) Somewhat aware ( ) Very aware
Jacuzzi Luxury Bath
14525 Monte Vista Avenue
Chino, CA 91710
1-800-288-4002
www.jacuzzi.com
MANUAL DE INSTALACIÓN E INFORMACIÓN SOBRE LA GARANTÍA
LG72000
07/2016
Página 2 www.jacuzzi.com
Instalación
Español*
Conserve estas instrucciones para uso futuro. Utilice el formulario a continuación para registrar su modelo y número de
serie para referencia futura.
Fecha de compra: _________________________________________________________________________
Comprado a: _________________________________________________________________________
Instalado por: _________________________________________________________________________
Número de serie: _________________________________________________________________________
Modelo: _________________________________________________________________________
Instalador: Deje el manual para el propietario.
Propietario: Lea este manual y consérvelo para referencia futura.
Información del producto. ................................................................................................................................................ 2
Instrucciones de seguridad importantes. ...................................................................................................................... 3-4
Inspección y prueba. ....................................................................................................................................................... 4
Estructura y soporte. .................................................................................................................................................... 5-6
Conexiones eléctricas. .................................................................................................................................................... 6
Material especíco de Fuzion
®
..................................................................................................................................... 7-8
Funcionamiento de la cromoterapia. ............................................................................................................................... 9
Procedimientos de instalación .................................................................................................................................... 9-12
Instalación de los paneles del faldón (solo para los modelos con faldón) .................................................................... 13
Limpieza luego de la instalación.................................................................................................................................... 13
Limpieza general. .......................................................................................................................................................... 13
Mantenimiento general. ................................................................................................................................................. 14
Servicio técnico autorizado............................................................................................................................................ 14
Tarjeta de registro de la garantía .............................................................................................................................. 15-16
*For Spanish and French installation instructions, please visit www.jacuzzi.com/baths/support/owners-manuals/.
*Para instrucciones de instalación en español, por favor visite www.jacuzzi.com/baths/support/owners-manuals/.
*Pour les directives d'installation en français canadien, veuillez visiter www.jacuzzi.com/baths/support/owners-manuals/.
Información del producto
Índice
www.jacuzzi.com Página 3
Instalación
Español
Instrucciones de seguridad importantes
Este es un producto de calidad profesional. Se requieren conocimientos prácticos de técnicas de construcción, fontanería
e instalación eléctrica según los códigos para la instalación apropiada y la satisfacción del usuario. Recomendamos que
todos los productos Jacuzzi® sean instalados por un contratista autorizado. Nuestra garantía no cubre problemas
relacionados con instalaciones inadecuadas.
LEA Y SIGA TODAS LAS INSTRUCCIONES. CONSERVE ESTAS INSTRUCCIONES. Utilice esta unidad solo
para el n para el cual fue diseñada, según se describe en este manual. No utilice accesorios que no estén recomenda-
dos por el fabricante. No deje caer ni introduzca objetos en ninguna de las aberturas.
PELIGRO: RIESGO DE LESIONES ACCIDENTALES O AHOGAMIENTO. No permita que los niños utili-
cen esta unidad a menos que sean supervisados atentamente en todo momento. No utilice bañeras de hidromasaje que
no tengan todas sus tapas protectoras de succión instaladas para evitar que el cabello o alguna parte del cuerpo quede
atrapada.
PELIGRO: RIESGO DE LESIONES GRAVES POR DESCARGA ELÉCTRICA O MUERTE POR
ELECTROCUCIÓN. Esta unidad se debe conectar solamente a un circuito de suministro que esté protegido por un
interruptor de circuito con detección de falla a tierra (GFCI, por su sigla en inglés) de 15 A. Dicho GFCI debe ser
suministrado por el instalador y debe ser puesto a prueba habitualmente. Cuando pruebe el GFCI, siga las instrucciones
del fabricante. El GFCI debería interrumpir la alimentación. Pulse el botón de restablecimiento. La alimentación debería
restablecerse. Si el GFCI no funciona de esta manera signica que está defectuoso. Si el GFCI interrumpe la
alimentación hacia la bañera sin que se pulse el botón de prueba, un ujo de corriente de retorno por tierra está
indicando la posibilidad de una descarga eléctrica. No utilice esta bañera de hidromasaje. Desconecte la bañera de
hidromasaje y haga corregir el problema por un representante calicado del servicio técnico antes de usarla.
PELIGRO: RIESGO DE DESCARGA ELÉCTRICA. No utilice electrodomésticos como secadores de pelo,
lámparas, teléfonos, radios o televisores dentro de un radio de 60 pulgadas (1524 mm) de esta bañera de hidromasaje.
Realice la conexión solamente a un circuito protegido por un interruptor de circuito con detección de falla a tierra (GFCI).
Para unidades conectadas permanentemente, hay un terminal de color verde o un conector de cable marcado como "G",
"GR", "GROUND" o "GROUNDING" dentro del compartimiento del terminal. Para reducir el riesgo de descarga eléctrica,
conecte el terminal o el conector al terminal a tierra de su servicio eléctrico o panel de alimentación con un conductor de
igual tamaño a los conductores del circuito que alimentan el equipo.
ADVERTENCIA: LA INMERSIÓN PROLONGADA EN AGUA CALIENTE PUEDE CAUSAR
HIPERTERMIA. La hipertermia ocurre cuando la temperatura interna del cuerpo alcanza un nivel muy superior a la
temperatura corporal normal de 98.6 ºF (37 ºC). Los síntomas de la hipertermia incluyen el aumento de la temperatura
corporal interna, mareos, aletargamiento, somnolencia y desmayo. La temperatura del agua por encima de los 104 ºF
(40 ºC) puede resultar perjudicial para su salud. Controle y regule la temperatura del agua antes de utilizar la bañera. Los
efectos de la hipertermia incluyen los siguientes:
A. Incapacidad para percibir el calor.
B. Incapacidad para reconocer la necesidad de salir de la bañera.
C. Desconocimiento de un peligro inminente.
D. Daño fetal en mujeres embarazadas.
E. Incapacidad física para salir de la bañera.
F. Pérdida del conocimiento con peligro de ahogamiento.
¡PELIGRO! Este equipo está previsto para uso en interiores solamente. Instale el equipo conforme a estas
instrucciones. Utilice los cables de alimentación adecuados para 167 °F (75 °C), incluido el índice de temperatura de los
conductores de alimentación que se van a utilizar. Esta unidad debe conectarse eléctricamente a tierra, y debe instalarla
un contratista, electricista o fontanero matriculado. Los materiales de construcción y el cableado deben direccionarse
lejos del motor/bomba o del generador de burbujas de aire, o de otros componentes de producción de calor de esta
unidad. En el exterior del motor/bomba y del calentador, se proporciona un conector de cable de presión para facilitar la
conexión de un conductor de unión de cobre sólido n.º 8 AWG entre esta unidad y todos los otros equipos eléctricos y los
metales expuestos próximos, según sea necesario para cumplir con los requerimientos locales.
¡PELIGRO! RIESGO DE LESIONES GRAVES O MUERTE. Riesgo de lesión fetal. Las mujeres embarazadas
o con posibilidad de embarazo deben consultar a un médico antes de utilizar una bañera de hidromasaje con calentador.
¡PELIGRO! RIESGO DE LESIONES GRAVES O AHOGAMIENTO. Mantenga el cuerpo y el cabello a una
distancia mínima de 6 pulgadas (152 mm) del accesorio de succión siempre que el sistema de hidromasaje esté en
funcionamiento. El cabello que caiga por debajo de los hombros debe llevarse recogido.
¡PRECAUCIÓN! No sumerja el panel de control llenando la bañera en exceso.
Página 4 www.jacuzzi.com
Instalación
Español*
Instrucciones de seguridad importantes (continuación)
¡ADVERTENCIA! RIESGO DE LESIÓN GRAVE. Para evitar lesiones, tenga cuidado al entrar y al salir de la
bañera de hidromasaje.
¡PRECAUCIÓN! No consuma drogas ni alcohol antes o durante la utilización de la bañera de hidromasaje con
calentador. Las personas que tomen medicamentos o tengan una historia clínica desfavorable deben consultar a un
médico antes de utilizar una bañera de hidromasaje con calentador. Podría producirse un ahogamiento.
¡ADVERTENCIA! RIESGO DE LESIONES GRAVES O MUERTE. No utilice una bañera de hidromasaje con
calentador inmediatamente después de realizar ejercicios físicos extenuantes.
¡PRECAUCIÓN! PARA REDUCIR EL DAÑO AL PRODUCTO. Utilice esta unidad solo para el n para el cual
fue diseñada, según se describe en este manual. No utilice accesorios que no estén recomendados por los fabricantes.
No altere los controles operados por el usuario ni los dispositivos semejantes.
CONSERVE ESTAS INSTRUCCIONES.
Jacuzzi Luxury Bath (la "empresa") ha obtenido los listados de los códigos (normas) aplicables que suelen estar
disponibles a nivel nacional para productos de este tipo. Es responsabilidad del instalador o propietario determinar el
cumplimiento de los códigos locales especícos antes de instalar el producto. La empresa no realiza declaraciones ni
ofrece garantías con respecto al cumplimiento de ningún código, ni será responsable de dicho cumplimiento. Las
especicaciones del producto están sujetas a cambio sin previo aviso.
Inspección
1. Retire la bañera de la caja de envío. Tenga cuidado de no rayar la supercie de la bañera con las grapas expuestas.
Retire las grapas o pliéguelas hacia el cartón. Conserve la caja hasta que la inspección del producto haya sido
satisfactoria. Nunca levante la bañera sujetándola por la fontanería; solo hágalo por el armazón.
2. Inspeccione el armazón y los componentes de la bañera. En caso de que la inspección revele cualquier daño o
defecto en el acabado o daño visible en los componentes, no instale la bañera. Los daños o defectos en el acabado
reclamados después de la instalación de la bañera están excluidos de la garantía. La responsabilidad de Jacuzzi
Luxury Bath por daños durante el transporte naliza contra entrega de los productos en buen estado al transportista.
3. Presente sus reclamos por daños al transportista. Para conocer los términos de la cobertura y las limitaciones de la
garantía, consulte la información publicada sobre la garantía embalada con el producto o al nal de este manual.
Vericación del funcionamiento y del agua de la bañera
El funcionamiento apropiado de todas las unidades y el buen estado de las conexiones herméticas son probados en
fábrica antes del envío. No obstante, el instalador debe examinar la unidad nuevamente antes de la instalación. Jacuzzi
Luxury Bath no se hace responsable de ningún defecto que pudiera haberse descubierto, reparado o evitado de haberse
seguido este procedimiento de inspección y prueba:
1. Coloque la bañera sobre una supercie nivelada, cerca de un suministro eléctrico, suministro de agua y drenaje de
agua adecuados. Una vía de acceso es una opción adecuada.
2. Cubra el oricio de drenaje y de desborde con una cinta o un tapón y llene la bañera hasta la base del oricio de
desborde.
3. Permita que el agua de la bañera repose por 5 minutos.
4. Conecte el motor/bomba y encienda la unidad. Conrme que todas las características funcionen según se describe
en el Manual de uso. No instale la bañera si no funciona como se describe.
5. Inspeccione visualmente todas las uniones para ver si hay goteos. No instale la bañera si se detectan pérdidas.
6. Vuelva a colocar la bañera en la caja o de lo contrario protéjala de daños hasta el momento de la instalación.
Inspección y prueba
www.jacuzzi.com Página 5
Instalación
Español
Estructura y soporte
LEA TODAS LAS INSTRUCCIONES DE INSTALACIÓN. LA INSTALACIÓN INADECUADA ANULA LA GARANTÍA.
La estructura del piso debajo de la bañera debe poder soportar el peso total de la bañera, el agua y el ocupante.
Consulte con un ingeniero mecánico.
¡IMPORTANTE!
Asegúrese de que las paredes y los pisos cumplan los requisitos de seguridad contra incendios del código de
construcción y/o los estándares mínimos de propiedad de acuerdo a la Administración Federal de la Vivienda/
Departamento de Vivienda y Desarrollo Urbano.
Respete todos los códigos y ordenanzas.
1. La correcta instalación es su responsabilidad. Haga instalar esta
bañera por un técnico calicado.
2. Se debe realizar la instalación con un interruptor del circuito de
fallos de conexión a tierra (GFCI).
3. Es responsabilidad del cliente:
Comunicarse con un instalador electricista calicado.
Asegurarse de que la instalación eléctrica es adecuada y sigue el
Código nacional de electricidad (NEC).
Se pueden encontrar las especicaciones técnicas en
www.jacuzzi.com/baths/support/.
Enmarque el espacio donde colocará la bañera. Al preparar el área deberá
tener en cuenta lo siguiente:
Las dimensiones proporcionadas en los diagramas de instalación son
nominales. Tome las medidas de su unidad al recibirla y construya
conforme a las dimensiones reales.
Para instalar el producto correctamente, el hueco nalizado debe tener
las dimensiones interiores correctas, según la sección de dimensiones
principales de la Hoja de especicaciones técnicas.
Para instalar en huecos de tres lados, utilice una bañera moldeada
integral con borde de azulejos en tres lados. Si utiliza el borde opcional
de azulejos, consulte las instrucciones incluidas en el kit.
De ser necesario, cuando remodele puede agregar travesaños en cada
punta para agregar una supercie vertical para clavar las cuñas
laterales del producto.
Para evitar obstrucciones durante la instalación, asegúrese de que las
tuberías de suministro y de la boca y la plomería de la válvula no
sobresalgan en el hueco.
Las bañeras necesitan una abertura en el piso de 6 x 12 pulgadas (150
mm x 305 mm) para el kit de drenaje, desagüe y rebosadero (DWO) de
1,5 pulgadas (38 mm).
Asegúrese de que la ubicación de la abertura en el piso coincida con la
ubicación del desagüe de la bañera.
Se recomienda utilizar yeso para moldear o de estuco (material para los
cimientos) para todas las estructuras comerciales (como hoteles, moteles,
dormitorios, gimnasios, etc.).
La bañera debe estar apoyada sobre su base, no sobre su borde.
Por norma UPC, se debe facilitar el acceso a la bomba/motor de su
modelo especíco (Figura 1 y 2).
Provea una ventilación apropiada para el enfriamiento y un suministro de aire suciente para la bomba/motor. No
coloque aislamiento alrededor del equipo.
Es responsabilidad del instalador, el contratista de obra o el propietario proporcionar el acceso al servicio. Jacuzzi
no se responsabiliza de ninguno de los costos relacionados con la obtención de accesos para efectuar reparaciones.
El propietario debe soportar dichos costos y, si es apropiado, debe solicitar la reposición del instalador.
Motor de la
bomba o del
generador de
burbujas de aire
Ejemplo
de ubicación
de acceso
Ejemplo
de ubicación
de acceso
A
B
Motor de la
bomba o del
generador de
burbujas de aire
Ejemplos
de ubicación
de acceso
Ejemplos de
ubicación de
acceso
A
B
Fig. 1
Fig. 2
A = Acceso principal (obligatorio)
B = Acceso secundario para el equipo
(opcional)
Las ilustraciones se muestran con estructura
para mayor claridad.
IMPORTANTE: El acceso a la unidad por la
izquierda se en cuentra en el lado opuesto
(en espejo).
Página 6 www.jacuzzi.com
Instalación
Español*
Estructura y soporte (continuación)
Contrapiso
Prepare el contrapiso para el drenaje y asegúrese de que el área esté nivelada.
1. El drenaje/rebosadero de la bañera se extiende por debajo de la parte inferior de ésta. Se pueden encontrar las
especicaciones técnicas en www.jacuzzi.com/baths/support/.
2. Realice los cortes adecuados en el contrapiso para ubicar el drenaje.
3. La base Tru-Level® de Jacuzzi es una característica estándar en todas las bañeras. Si el contrapiso está nivelado y
tiene una supercie continua, no es necesario realizar otra preparación. Diríjase a la sección “Conexiones eléctricas”.
4. Si el contrapiso no está nivelado, debe nivelar toda la supercie antes de instalar la bañera. Los materiales utilizados
asegurarán que la bañera esté sostenida desde la parte inferior. Estos materiales incluyen: compuesto de nivelación,
mortero, yeso o espuma estructural de mínima expansión (con una densidad de 5 lb/pie cúbico, como mínimo). La
bañera debe permanecer nivelada para que pueda drenar adecuadamente, y debe hacer contacto con el material de
nivelación. Ambos lados de una junta o un empalme del contrapiso deben estar nivelados.
Conexiones eléctricas
PELIGRO: RIESGO DE DESCARGA ELÉCTRICA. Realice la
conexión sólo a un circuito protegido por un GFCI (Figura 3).
¡PRECAUCIÓN! La toma eléctrica debe instalarse 4" (101 mm)
por encima de la línea del piso y un máximo de 12'' (305 mm) hacia dentro
desde el borde de la bañera (Figura 3), o de acuerdo con los códigos
eléctricos y de construcción locales.
¡PRECAUCIÓN! Riesgo de calentamiento excesivo de los
componentes. No utilice el prolongador eléctrico para suministrar corriente
a esta unidad. El accionamiento de la bomba sin la cantidad de agua
suciente en la bañera pueden causar un daño permanente a la bomba o
motor.
Si la unidad del GFCI indica mal funcionamiento, según las instrucciones
del fabricante, DESCONECTE la alimentación y no intente utilizar la bañera
hasta identicar y corregir el origen del problema.
NOTAS: Al utilizar productos eléctricos, siempre debe tomar las siguientes
precauciones básicas. Siempre siga los códigos para el sistema eléctrico
y de construcción locales. Es necesaria una conexión a tierra. La unidad
debe ser instalada y conectada a tierra por un electricista especializado.
SOLO PARA MODELOS CANADIENSES: Los componentes deben estar
conectados en las cajas de conexiones (incluidas) que se encuentran en la
unidad.
Se pueden encontrar las especicaciones técnicas
en www.jacuzzi.com/baths/support/.
Fig. 3
(101 mm)
12˝
(305 mm)
En gura: Hidroma-
saje con calentador
opcional
En gura: Bañera
Pure Air®
(101 mm)
12˝
(305 mm)
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44

Jacuzzi LNS6032ALR2XXW Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI