elco EL-160 SOL-TECH 3 RF/3,0 User manual

Type
User manual
6.2008
CD2c d
2
22
21
11
16
66
60
00
0
S
SS
SO
OO
OL
LL
L-
--
-T
TT
TE
EE
EC
CC
CH
HH
H/
//
/3
33
3.
..
.0
00
0
1/3
CD2c d
INSTALLATION INSTRUCTIONS 2
22
2160 SOL
160 SOL160 SOL
160 SOL-
--
-TECH/3.0
TECH/3.0TECH/3.0
TECH/3.0
PACKAGE CONTENTS
1 TANK STAND BEAM 1200mm PCs 2
2 CONNECTING SUPPORT PLATE 1338mm PCs 2
3 TANK STAND FOOT PCs 2
4 BOLT M8x50 PCs 12
5 BOLT M8x20 PCs 19
6 WASHER Μ8x16 PCs 23
7 WASHER Μ8x24 PCs 8
8 NUT Μ8 PCs 23
9 UPPER BEAM BASE PCs 2 (1L+1R)
10 COLLECTOR STAND BEAM 1602mm PCs 2
11 COLLECTOR STAND FOOT PCs 2
12 COLLECTOR SUPPORT ANGLE BEAM 1750mm PCs 1
13 COLLECTOR SUPPORT UPPER BEAM 1750mm PCs 1
14 STORAGE TANK (BOILER) PCs 1
15 SELECTIVE SOLAR COLLECTOR PCs 2 (1L+1R)
16
TEE COUPLING FOR COPPER TUBE
22 ¾˝
22
PCs 2
17
STRAIGHT COUPLING FOR PLASTIC TUBE ¾˝
22
PCs 3
18
ELBOW COUPLING FOR PLASTIC TUBE ¾˝
22
PCs 1
19
22 PLASTIC TUBE
LENGTH 2,2m
20 ISOPIPE UV 9x22 TUBE ISOLATION LENGTH 1x2m & 1x0,25m
21 2.5 bar SAFETY VALVE PCs 1
22 8 bar SAFETY VALVE PCs 1
23 ½˝ FEMALE CAP PCs 1
24 HEAT TRANSFER LIQUID LITERS 5
25 INSTALLATION INSTRUCTIONS PAGES 3
NOTES:
The 22 plastic tube (19) and the tube isolation ISOPIPE UV 9x22 (20) has to be cut in two pieces of 0,45m and 1,62m.
WARNING:
FILLING WITH HEAT TRANSFER LIQUID MUST TAKE PLACE WITH THE COLLECTORS FULLY
COVERED
For the filling procedure use a funnel and a 2-3 liter pitcher. The system must be filled with heat transfer fluid before
plugging in the 2.5bar safety valve (21) on the filling pipe and the ½˝ female cap (23) on the fill check pipe. Fill up the
system with the heat transfer liquid (24) and complete the filling with water, slowly, until there is a steady drip from the fill
check pipe. Wait for some time allowing the liquid to settle and continue filling up. Repeat the procedure until no more air
escapes. The filling up time is approximately 20 minutes.
DURING THE INSTALLATION PAY ATTENTION TO THE TILT OF THE COLLECTORS AND THE
PLASTIC TUBES
The collectors have to be installed, always using a plumb, horizontally. Plastic tubing must always follow upward direction
in order to avoid air enclosure into the heating transfer fluid piping. This is a necessity for the system’s efficient
performance.
PICTOGRAMS USED:
Temporary hand tight
Tighten firmly
Use pipe thread sealant
6.2008
CD2c d
2
22
21
11
16
66
60
0 0
0 SOL
SOLSOL
SOL-
--
-TECH
TECHTECH
TECH/
//
/3
33
3.
..
.0
00
0
2/3
6.2008
CD2c d
2
22
21
11
16
66
60
0 0
0 SOL
SOLSOL
SOL-
--
-TECH
TECHTECH
TECH/
//
/3
33
3.
..
.0
00
0
3/3
  • Page 1 1
  • Page 2 2
  • Page 3 3

elco EL-160 SOL-TECH 3 RF/3,0 User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI