Newport Brass 3-192/03N Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Newport Brass 3-192/03N Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
INSTALLATION INSTRUCTIONS
1
FLOOR RISER KIT
Model No: 3-196
Used with 934 (not included)
Shown with 934 faucet
and shut off valves 3-192,
sold separately
2
Product Size Specification Diagram
Escutcheons included with
934 are not required for this
installation scenerio
The use of additional riser support
bracing (not included) at a location
above floor level is recommended.
3
Shut-off Valve
Escutcheon
3/4” NPT Brass Nipple
(not included)
3/4” Ear Copper Sweat Elbow
(not included)
Copper Pipe
(water supply)
Wood Screws
(not included)
Recommended Installation by a Professional Plumbing Contractor
Note: Many installation variations are available. One potential scenario is outlined below.
Adhere to industry standards & local regulations when installing this product.
The use of petroleum base plumbers putty on our products will nullify the warranty. We recommend the use of clear silicone seal -
ing materials.
Fig. 1: For riser inlet NIPPLE (1)-(3/4” NPT, not included), deck hole diameters of 7/8are recommended. Two holes are required at
a spacing of 6- center to center). The nipple should protrude approximately 7/8from the floor surface.
Fig 2: Apply thread sealant to the threads of the NIPPLE (1) and thread into fitting below the deck. Place ESCUTCHEON (2) over
NIPPLE (1). Attach Shut-off VALVE (3) to the other end of NIPPLE (1) and flush against ESCUTCHEON (2).
Fig 3: Attach the RISERS (4) to shut-off VALVES (3).
Fig 4: Discard ESCUTCHEONS (2a) provided with FAUCET (5). Thread FAUCET (5) to RISERS (4).
Fig 5: Attach HOSE (6) to FAUCET (5) and hand SHOWER (7). (Hand-tighten and secure each connection with a wrench ¼ turn.).
Turn on water supply. Check for leaks and make any final adjustments as necessary.
1
2
3
Fig. 3
Fig. 4
Fig. 5
7
6
5
3
4
4
2a
Fig. 2
Riser
4
Floor
Fig.1
1
2
Floor
Joist
2 x 4 Stud
Adhere to industry standards & local
regulations when securing water supply
under the finished floor.
The use of additional riser support
bracing (not included) at a location
above floor level is recommended.
6”
7/8”
/