D+H OT-Schelle Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the D+H OT-Schelle Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
99.950.24 1.2/01/03
D+H Mechatronic AG • Georg-Sasse-Str. 28-32 • D-22949 Ammersbek • Tel. +49 40-605 65 219 • Fax +49 40-605 65 264
Mounting instructions
OT-clamp for ZA-OT drives
Application
By using an OT-clamp the stroke of ZA-OT
(rack and pinion drive without tube) can be
limited without any technical changes at the
drive.
Mounting instructions: simply put on and
screw up the OT-clamp on the rack at the
desired position.
Safety Notes
Attention! Danger of violent pressure.
Do not use the OT-clamp in a hand-
accessible area.
Guarantee
You will get 2 years guarantee for all D+H
products from date of verified handing over
of the system up to maximal 3 years after
date of delivery, when mounting and starting
has been carried out by a D+H authorized
distributor.
D+H guarantee is expired, with connection
of D+H components with external systems
or with mixing of D+H products with parts of
other manufacturers.
/