FMI BTC-8 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the FMI BTC-8 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
122943-01
Rev. B
12/07
DESA Heating, LLC
2701 Industrial Drive
Bowling Green, KY 42101
www.desatech.com
1-866-672-6040
VENTING INSTALLATION USING 8" B-TYPE
VENTING SYSTEM
Transition pipe model BTC-8 and starter collar are shown below. Remove starter collar and set aside. Slide tran-
sition pip over vent collar and attach with a minimum of 4 screws. Replace starter collar over transition pipe and
attach using 4 screws located on leg stands. To install b-vent piping, slide rst piece of b-vent over transition pipe
and attach with either a minimum of 3 screws or other means approved by the vent manufacturer.
B-Vent Piping
Transition Pipe
Model BTC-8
Starter Collar
Vent Collar
/