![](//vs1.manuzoid.com/store/data-gzf/b7d24e0f026db47ee2dffa5a177b75c5/2/002073043.htmlex.zip/bgf.jpg)
11
11
ProductAssembly STEP
1.RemovethetwoLinearBearing
CartridgesbyremovingeightM6X
12LRoundScrew(109)andeight
M6Spring Washers(124)fromthe
ConnectorFrame(15).Rotatethe
Platesbyfirstremovingfour5/16”
X1/2”SunkenHeadBolts(122)
fromtheConnectorFrame(15)as
showninFigures1and1.1.
Repeatfortheotherside.
2.
3.
RefertoFigures2and2.1.CAREFULLY
andSLOWLYslidethetwoLinearBearing
CartridgesontotheSolidLinearGuide Rod
(11)asshown.NOTE: Damagetothe
LinearBearingsduetoimproper
assemblyisnotcoveredbywarranty.
Slidea48mmRubberCushion(75)ontothe
upperportionoftheSolid Linear Guide Rods
(11), thenrestanother 48mmRubber Cushion
(75)ontop of the Lower Rod Holder of the
Main Upright Frame (5) as shown in Fig. 2.
RefertoFigures2and2.2.Loosenthetop
andbottom5/16”X 1/4”InnerHexScrews
(116).While holdingtheSolidLinearGuide
Rod(11)ata slightangle(asshown),slide
thetopportion oftheSolid Linear Guide Rods
(11)upthroughthe Upper Rod Holder. Insert a
48mm Rubber Cushion (75) into the bottom
portion of Solid Linear Guide Rod (11), then
lower Solid Linear Guide Rod (11) into Lower
Rod Holder as shown in Fig. 2.3.
4.RefertoFig.3.Re-installtheLinearBearing
Cartridgesusingthepreviouslyremoved
eightM6X12LRoundScrew(109)andeight
M6Spring Washers(124)attheConnector
Frame (15).ThenrotatethePlatesbackinto
their originalpositionandsecureusingthe
four previouslyremoved5/16”X1/2”Sunken
HeadBolts(122).Repeattheprocessfor
theotherside.
Thisstepisforlowceilingheightinstallations84.5”
IfyoucompletedStep5onthepreviouspage,
skipthispageandcontinuetothenext.
5.SecurebothoftheSolidLinearGuideRods(11)bytighteningthe
two5/16”X1/4”InnerHexScrews(116).
5b
11
13
Lower
Rod
Holder
5
Slight
Angle
116
11
13
75
75
116
109
109
122
122
124
124
15
11
15
Plates
109
109 124
122
124
15
Remove
Linear Bearing
Cartridges