Milli 9510627 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Milli 9510627 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Page 01
Stud
Stud
Stud
Stud
**
*
Stud
Date 31/08/2023
Instruction is to be left with the end user for future
reference.
of 01
Milli Marle Accessories
Christopher Bedeux this is still showing the
two Milli ranges in the one document. We just
need a separate install instruction for Milli
Meld Edit with the install diagrams for towel
rails, Toilet roll holder, robe hook and shelf.
Then an instruction for Milli Marle with
diagram install for towel rail, then show the
other product diagrams for the range as
available
NOTE
Wall materials vary. The accessory fixing kit supplied is suited for solid wall fixing.
For timber framed walls, please ensure the accessory is fixed to a noggin/stud behind the wall.
Where stud/noggin is not available, please use suitable hollow wall fixing.
Stud
Stud
*Milli Marle Accessories
Stud
*
Stud
ŸFollow the multi-rail wiring configuration shown in the
Installation - 1 diagram (Page 3).
Installation - 4
Note: DO NOT strip ends bare.
ŸInsert electrical wiring (1) into the Waterproof Connector Socket (2).
Note: Ensure all inserted wires are pushed to the back of the
waterproof connector.
ŸUse a hand crimping tool or pliers to crimp the red connector button
(3) into the main body (4).
ŸWipe off any excess waterproofing gel from the connector.
ŸUse the remaining gel connectors to cap off the electrical wires on
unused rail end.
ŸTuck the crimped waterproof connectors and wiring into the rail
opening.
ŸSlot the rail opening into the wall brackets.
ŸUse the supplied Allen Key to secure the supplied Hex Screws (5)
into the wall brackets.
Optional: Double robe hook slides over top of rail (No fixing required)
5
2
4
Installation Instructions
/