ANZZI FR-AZ091BN, FR-AZ091CH, FR-AZ091ORB Installation guide

  • Hello! I am an AI chatbot trained to assist you with the ANZZI FR-AZ091BN Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FR-AZ091BN
FR-AZ091CH
FR-AZ091ORB
FIVE HOLES BA THROOM BA THTUB F AUCET
ITEMS YOU MA Y NEED .
NEED HELP? Give us a call at 1-844-44-ANZZI or visit us online at www.ANZZI.com.
PREP ARA TION
MAKE SURE TO SHUT OFF THE W A TER FLOW FROM YOUR HOT AND COLD SUPPL Y LINES .
MAKE SURE YOUR MOUNTING HOLE IS CUT TO SIZE .
HOT
COLD
1.Connect the flexible hose(not included) to water
supply valve (not included),and
DON'T OVER TIGHTEN!
Caution: make sure to connect the hot and cold
W arning:
Supply valves and flex hoses not included.
tighten it with adjustable wrench.
flexible hoses to supply valves correctly.
STEP 6
STEP 1
STEP 2
Handle installation
1.Disassemble the hot water handle.
2.From underneath, insert the hot water valve,
From Top, install the handle and fixing nut.
3.Screw the nut to secure the valve.
4.Repeat steps to install cold water handle and cold water valve.
rubber washer, metal washer and lock nut.
Handle
Spout installation
1.Disassemble the spout .
2.Place rubber washer
STEP 3
STEP 4
,metal washer and secure the nut.
fixing nut
rubber washer
metal washer
valve body
2.83"
5.91"
7.87"
3.54"
5.51"
rubber washer
nut
STEP 5
1.Repeat steps to install the handle
and diverter in the hole located on the
Diverter installation
Hand shower holder installation
right of the cold water handle.
metal washer
1.Put the base into the hole.
2.Put the
hand shower holder through the base.
Valve and water supply connection
1.
HAND SPRA YER FLOW RA TE: 2.0GPM
MAX 21"
7"
7"
7"
7”
The center of each hole should be 7".
Purchased separately .
HOT
COLD
19.69”
19.69”
27.56”
/