ZeroEnergy TSHRU-1K Installation guide

Type
Installation guide

This manual is also suitable for

ZeroEnergy® IOM-012
Patent Pending
© Olive Tree Energy 2014
All Rights Reserved, OTE No. 09-00803
Manufactured By: Olive Tree Energy LLC
15488 N. Nebraska Ave. Lutz, Florida 33549
Phone: 813-978-3733
OliveTreeEnergy.com
P.2
INSTALLATION OVERVIEW
Model No.: TSHRU060
MUST BE INSTALLED BY A LICENSED HVAC & PLUMBING PROFESSIONAL!
This guide references the ZeroEnergy Unit Installation Manual which is packaged with the unit.
All steps must be completed in order.
1. Plan, Prep, and Setup
Determine location of the ZeroEnergy unit (P. 12- Step 1) and determine
refrigerant line sizes and lengths (P. 4-8)
2. Run Refrigerant Lines
Run the proper line sizes and lengths as calculated from Step 1 from the
condenser to the ZeroEnergy unit (P. 9-11)
Note: Do not have any exposed pipe in contact with solid / ridged material.
3. Connect Refrigerant Lines
Recover the refrigerant from the condenser and make the appropriate
connections (P. 9-11)
Note: To avoid customer discomfort, it is advised to reduce the inside
temperature of the home for a full hour before disconnecting the unit.
4. Charge the System
Charge the system back to the factory specifications of normal superheat and
subcooling (P. 9)
5. Plumb the ZeroEnergy and the Water Heater
Connect the ZeroEnergy unit to the hot water tank (P. 12-13)
Verify Proper Operation
Complete the “Installation Checklist” (P.16)
  • Page 1 1

ZeroEnergy TSHRU-1K Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI