TB-PAB 10

SPEEDI-GRILLE TB-PAB 10, TB-MC4 14, TB-PAB 06, TB-PAB 14 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the SPEEDI-GRILLE TB-PAB 10 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
T-Bar Register Grille Installation
Steps:
1. Remove the ceiling tile where the grille will be installed.
2. Remove the adjacent ceiling tile for access to ducting.
3. Place T-Bar grille into suspended ceiling grid.
Note: Grilles can be secured at seismic support holes.
(Seismic anchor brackets not included).
4. Slide the flexible duct onto the grille collar.
5. Secure ducting with foil duct tape and large zip tie (not provided).
6. Finish by placing the adjacent tile back into place.
/