HIGH VOLTAGE KIT
This kit will alter the input AC voltage on a DoorKing 115 VAC: 6500, 6550, 6300, 9000, 9150 or 1600 Series
operators to 208, 230, 460 or 575 VAC. DO NOT USE THIS KIT ON ANY OTHER OPERATOR.
Choose and follow the installation and wiring instructions for YOUR specific operator on the next 4 pages.
DoorKing Part Number
2600-266
Step-Down Transformer Optional Voltage Wiring
AC Input Power Wire Limitations
Input Voltage
Motor Amps
Wire Size / Max Distance in FeetPrimary/Single Operator
12 AWG 10 AWG 8 AWG 6 AWG
208/230 VAC
460 VAC
575 VAC
208/230 VAC
460 VAC
575 VAC
1/2 HP
1/2 HP
1/2 HP
1 HP
1 HP
1 HP
685
2875
2875
380
1500
1500
1100
4600
4600
650
2500
2500
1830
7665
7665
1100
4000
4000
2750
11,500
11,500
1600
6500
6500
2.8 Amps
1.4 Amps
1.0 Amp
5.0 Amps
2.5 Amps
2.0 Amps
The table below shows the AC input power wire size and maximum distance wire run limitations. If AC power wire run is greater than the maximum distance
shown, it is recommended that a service feeder be installed. When large gauge wire is used, a separate junction box must be installed for the operator
connection. An external power disconnect switch is required. Check local building codes before installation.
Choose desired input voltage harness and connect accordingly AFTER step-down transformer has been mounted in the operator.
Note: Wire run distances are based on
NEC guidelines for copper wire allowing
a maximum 3% voltage drop on the line.
The calculated distance was then further
reduced by 10% to allow for other loses
in the system.
Never run HIGH voltage rated wire
insulation in the same conduit as
LOW voltage rated wire insulation.
Keep them in separate conduits.
Step-Down
Transformer
To operator
115 VAC
power
terminal.
To operator
Chassis
Ground.
Transformer Plug
Configuration
(Plug end view)
Yellow
123
456
Purple
Brown
Blue
Red
Orange
230 VAC Input
1st Leg
2nd Leg
Use only two legs of the
incoming 3-phase power
and terminate the 3rd leg.
230 VAC
1-Phase/
3-Phase
Power Wire
External Power
Disconnect
Switch
Required
3rd Leg
230 V Harness
Transformer
Plug
230 V Harness
Configuration
(Wire end view)
1st Leg
2nd Leg
123
4
Orange
Purple
Yellow
56
460 VAC Input
1st Leg
2nd Leg
Use only two legs of the
incoming 3-phase power
and terminate the 3rd leg.
460 VAC
3-Phase
Power Wire
External Power
Disconnect
Switch
Required
3rd Leg
460 V Harness
Transformer
Plug
460 V Harness
Configuration
(Wire end view)
1st Leg
2nd Leg
123
4
Orange
Purple
Yellow
56
575 VAC Input
1st Leg
2nd Leg
Use only two legs of the
incoming 3-phase power
and terminate the 3rd leg.
575 VAC
3-Phase
Power Wire
External Power
Disconnect
Switch
Required
3rd Leg
575 V Harness
Transformer
Plug
575 V Harness
Configuration
(Wire end view)
1st Leg
2nd Leg
123
4
Orange
Purple
Yellow
56
208 VAC Input
1st Leg
2nd Leg
Use only two legs of the
incoming 3-phase power
and terminate the 3rd leg.
208 VAC
1-Phase/
3-Phase
Power Wire
External Power
Disconnect
Switch
Required
3rd Leg
208 V Harness
Transformer
Plug
208 V Harness
Configuration
(Wire end view)
1st Leg
2nd Leg
123
4
Orange
Purple
Yellow
56
2600-267-H-12-18
Model 6500
Installation for a 115 VAC 6500 primary operator ONLY.
Step 1: Bolt step-down transformer in position shown using the nuts and bolts
supplied with this kit.
Step 2: Wire the step-down transformer for the desired input voltage (see first page).
Operator
MUST be
properly
grounded.
Chassis Ground
Neu Hot
Black
Green
White
115 VAC Input
115 VAC Output
6500 OR 6550 115 VAC
Power Terminal
Step-Down
Transformer
Keep wires away
from moving parts.
DANGER
HIGH VOLTAGE!
Primary 6500
Primary 6550
Ope
rator illustrated
without electronic
box to better show
transformer
mounting position.
Reset Box
Bracke
t
Dual Gate Operators Installation: When installing on
bi-parting gates, a step-down transformer and AC input
power wire is only required for the PRIMARY gate
operator. Reduce the AC input power wire run max
distance by ONE-HALF.
“Optional” Heater Installation: When installing a heater,
refer to the “high voltage AC power wire size and
distance limitations” table on the instruction sheet with
the heater kit for AC input power wire run limitations.
Important Notes:
Model 6550
Installation for a 115 VAC 6550 primary operator ONLY.
Step 1: Bolt step-down transformer in position shown using the nuts
and bolts supplied with this kit.
Step 2: Wire the step-down transformer for the desired input voltage
(see first page).
Dual Gate Operators Installation: When installing on
bi-parting gates, a step-down transformer and AC input
power wire is only required for the PRIMARY gate
operator. Reduce the AC input power wire run max
distance by ONE-HALF.
“Optional” Heater Installation: When installing a heater,
refer to the “high voltage AC power wire size and
distance limitations” table on the instruction sheet with
the heater kit for AC input power wire run limitations.
Important Notes:
Variable Input Power
(see first page)
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
Use 3 existing
holes to mount
step-down
transformer.
Step-Down
Transformer
Mounting
Position
Orange
Purple
Yellow
Wire
Ru
n
Heate
r
Mounting
Posi
t
ion
2600-267-H-12-18
Model 9000
Installation for a 115 VAC 9000 primary operator ONLY.
Step 1: Bolt step-down transformer in position shown using the (4) four nuts and bolts supplied with this kit.
Step 2: Wire the step-down transformer for the desired input voltage (see first page).
Step-Down
Transformer
Mounting
Position
Power
Terminal
Primary
9000
ONLY
P
U
SH
T
O
O
P
E
R
A
T
E
t
e
ch
n
i
cia
n
u
se
o
n
l
y
Powe
r
Dual Gate Operators Installation: When installing on bi-parting gates, a
step-down transformer and AC input power wire is only required for the
PRIMARY gate operator. Reduce the AC input power wire run max distance
by ONE-HALF.
“Optional” Heater Installation: When installing a heater, refer to the “high
voltage AC power wire size and distance limitations” table on the
instruction sheet with the heater kit for AC input power wire run limitations.
Important Notes:
Operator MUST be
properly grounded.
Chassis Ground
Neu Hot
Black
White
Green
115 VAC Input
115 VAC Output
115 VAC
Power Terminal
Step-Down
Transformer
Keep wires away
from moving parts.
DANGER
HIGH VOLTAGE!
Neu Hot
Model 6300
Installation for a 115 VAC 6300 primary operator ONLY.
Step 1: Mount step-down transformer on the 4 existing threaded studs using the (4)
four nuts supplied with this kit.
Step 2: Wire the step-down transformer for the desired input voltage (see first page).
Operator MUST be
properly grounded.
Step-Down Transformer
Mounting Position
Primary
6300
ONLY
Black
White
Green
115 VAC Input
115 VAC Output
Dual Gate Operators Installation: When installing on bi-parting gates,
a step-down transformer and AC input power wire is only required for
the PRIMARY gate operator. Reduce the AC input power wire run max
distance by ONE-HALF.
“Optional” Heater Installation: When installing a heater, refer to the
“high voltage AC power wire size and distance limitations” table on
the instruction sheet with the heater kit for AC input power wire run
limitations.
115 VAC
Power Terminal
Chassis
Ground
Step-Down
Transformer
Keep wires away
from moving parts.
DANGER
HIGH VOLTAGE!
Power Terminal
Important Notes:
Variable Input Power
(see first page)
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
Orange
Purple
Yellow
Variable Input Power
(see first page)
Orange
Purple
Yellow
2600-267-H-12-18
Green
Model 9150
Installation for a 115 VAC 9150 operator ONLY.
Step 1: Mount step-down transformer on the (4) four existing threaded studs (below the motor) using the (4) four nuts supplied with this kit.
Attach the wires acrossed the top of the main support bracket. Avoid moving parts.
TIP: It is MUCH easier to install the step-down transformer before mounting the operator and attaching the chain. Flip operator upside down for access.
Step 2: Wire the step-down transformer for the desired input voltage chosen (see first page).
Operator MUST be
properly grounded.
Black
White
115 VAC Input
115 VAC Output
115 VAC Output
115 VAC Operator
Power Terminal
Chassis Ground
Hot
Hot Hot
Neu
Neu
Step-Down
Transformer
Power Terminal
RE
V
ER
SE
SENSIT
I
VIT
Y
REVERSE
L
OO
P
EXI
T
L
OOP
KE
Y SW
I
TCH
D
OORKING
460
2-010
SW
1
SW2
OPEN
TIMER
Step-Down
Transformer
Mounting
Position
Keep wires away
from moving parts.
DANGER
HIGH VOLTAGE!
Main
Support
Bracket
Dual Gate Operators Installation: When installing on bi-parting gates,
a step-down transformer and AC input power wire is required for
EACH operator.
“Optional” Heater Installation: When installing
a heater, refer to the “high voltage AC
power wire size and distance
limitations” table on the instruction
sheet with the heater kit for AC
input power wire run
limitations.
Important Notes:
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
Variable Input Power
(see first page)
Orange
Purple
Yellow
2600-267-H-12-18
Transformer
Operator MUST be
properly grounded.
Chassis Ground
1600 Series
Installation for a 115 VAC 1600 series (1601, 1602, 1603) operators ONLY.
Step 1: Mount step-down transformer.
Remove the 1 screw, unbolt the ground wire from the chassis ground and CAREFULLY remove circuit board.
Bolt transformer to existing threaded studs on back of supplied plate using the (4) four nuts supplied with this kit.
CAREFULLY install the plate and re-install circuit board.
Step 2: Wire the step-down transformer for the desired input voltage chosen (see first page).
Neu Hot
Black
White
115 VAC Input
115 VAC Output
115 VAC
Power Terminal
Step-Down
Transformer
Keep wires away
from moving parts.
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
DANGER
HIGH VOLTAGE!
Dual Gate Operators Installation: When installing on bi-parting gates, a step-down transformer and AC input power wire is required for EACH operator.
“Optional” Heater Installation: When installing a heater, refer to the “high voltage AC power wire size and distance limitations” table on the
instruction sheet with the heater kit for AC input power wire run limitations.
Important Notes:
RE
VERSE
S
ENSI
T
I
VI
T
Y
T
IME
DE
L
A
Y
P
OW
ER
1
ON
2 3 4 5 6 7 81
ON
2 3 4 5 6 7 8
NC
NO
UP
L
O
O
P
DO
W
N
L
O
O
P
Plate
(Supplied)
Circuit Board
Ground
Wire
1600
Electronic
Box Assembly
Power
Terminal
Green
Variable Input Power
(see first page)
Orange
Purple
Yellow
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

DKS 1601 / 1602 / 1603 / 6300 / 6500 / 9000 / 9150 - 2600 High Voltage Kit User manual

Category
Motorcycle Accessories
Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI