Note
Entry equipment
Disribution network
Inverter Control
1Add Device
Long press the reset button, when the LED indicator lights up again
and turns into a "blue light"Release the reset button after the status is
displayed for a long time, and the inverter will automatically complete
the reset.
Reset
2
3
4
5
Device
Room
Group
My De vice: 1
Sun ny 22℃
Out door A ir Qua lit y Mode rate
My Home
>
+
10:20 68%
中国移 动
WVC -Mode m
Mic ro Inv erte r
10:20 68%
中国移动
Inverter s ettings …
5% 25% 50% 75% 100%
Power S wit ch
Power Adjus tment
Note:T he(ene rgy Clear) funct ion can clea r the
power o f the dev ice and cann ot be res tored.
Pleas e opera te with caut ion!! !
Local Timer Energ y Cle ar
Temper ature
39 8℃
·
Power Curve
1635.2 w
12:00
1635.2 w
Setup
>
PV Volta ge
PV Curren t
Output Voltage
Output Cu rrent
36.5V
9.31A
231.6V
2.36A
345 4w
251 7w
PV Powe r
Outpu t Pow er
·
146.08kW h
Energ y 39 8℃
Temper ature
·
·
·
10:20 6 8%
中国移动
…
WVC-MODEM-Collector
Micro inverter Use Manual(Life)
Micro inverter Use Manual(Life)
Micro inverter Use Manual(Life)
Micro inverter Use Manual(Life)
a) Connect the communication antenna on the inverter;
b) Put the inverter in a place with good Wifi signal;
c) The connected Wi-Fi network needs to be in 2.4G mode;
d) Please reset the inverter for the first use;
Please strictly observe the following installation conditions
Please use the QR code to scan and install the "Cloud Intelligence"
client application,System version: Android 5.0, IOS 9 and above
Temperatu re
39 8℃
·
Power Cur ve
1635.2w
12:00
1635.2w
Setup
>
PV Voltage
PV Curr ent
Outpu t Volt age
Outpu t Curre nt
36.5V
9.31A
231.6V
2.36A
345 4w
251 7w
PV Power
Output Power
·
146.08kW h
Energy 39 8℃
Temperature
·
·
·
10:20 68%
中国移动
…
WVC-MODEM-Collector
Setup
PV Input
AC Output
Temperature
Data query
Features
Power Output
Attributes
●
●
●
●
●
●
●
●
●
Smart APP can realize real-time data transmission with the cooperation of
Alibaba Cloud IoTThrough graphs and graphic displays in time, users can
understand the operation of the power station. The user can monitor the
operation and adjust the output power function of the system.
10:20 68%
中国移动
DOWNLOAD
Cloud Intelligence APP
云智能
CO-2 induced environmental analysis
Daily and total energy generation in kWh
Actual DC input voltage, current and power
Actual AC output voltage, current and power
Inverter temperature
Historical (daily, weekly, monthly) power curve
Power losses due to weather induced effects
Optional limitation of power output
Online switch for the inverter start stop
INTELLIGENT Iot MONITORING MODEM
Number of data collectors per Modem
Built-in WiFi IoT data terminal
Can be used on any smart device (Android/iOS)
Open the intelligent monitoring software
"Cloud Intelligence" APP to log inAccount,
click the "+" icon in the upper right corner to
start addingEquipment program;*If there is a
device under the current account, click on the
deviceIcon to enter the details page)
When the smart APP changes to
the QR code scanning state, scan
the QR code label on the inverter
body. At this time, the APP will
automatically collect the inverter
code and automatically jump to the
Wi-Fi connection page, enter Click
N e x t a f t e r t h e c u r r e n t W i - F i
password;
Connect the inverter to the
power supply as required, and
q u i c k l y p r e s s t h e " R e s e t "
button. At this time, the "LED"
indicator will change to flashing
blue and red alternately. At this
time, the inverter enters the
standby state of the distribution
network;
Initialization
Remote switch
Energy Clear
Remarks
1. When multiple inverters need to be added,
theIn the English state, "," comma separated
and ended. Such as: 60001234, 6000E312,
2. Each Modem can monitor 60 inverters at the
same time;3. A total of 2 lists, each list can be
filled with 30 inverter codes;
Click the "Settings" button in the
upper right corner of the system details
page. In the settings page, you can
adjust the inverter's output power,
timing, remote start and stop, etc.
according to actual needs.
When the inverter is in standby mode,
return to the mobile phone APP to initialize
the device operation page, check the "I
have completed the above operations"
below and click the "Start Connection"
button. At this time, the page will jump to
the signal search page. The LED indicator
on the converter changes from red and
blue alternately flashing state to "blue"
long-bright display state when the network
distribution is completed. The page will
a u t o m a t i c a l l y j u m p t o t h e s y s t e m
completion confirmation page, please click
"Finish".
WVC -1200
Mode l:Life
SN:20210225
PK:20000513
Reset
LED
Initialize Device
Power on t he device,confirm indicator light blin ks
rapidl y
Check your de vice status a nd try again >
Device indicato r
设备指示灯
I have comple ted the precedi ng operatio ns
Connect
10:20 6 8%
中国移动
Cloud Intelligence APP