PARTS LIST:
Please lay out all parts and read instrucons prior to start of assembly:
WALL MOUNT INSTRUCTIONS:
Step 1: Posion one bracket (A), with wider end poinng up,
on the wall where the Wall Mount Accordion Drying Rack is
to be mounted.
Using a pen, mark the 3 screw hole locaons directly through
the bracket screw holes.
Note: be sure there are no electrical wires running through
the wall in the area where the screws are to be placed.
Step 3: Move brackets away from wall and drill a hole in the
marked areas, using 1/4” drill bit.
Press the plasc wall mount mollies (B) into the hole openings
(3 for each bracket). Lightly tap with a hammer if necessary.
Place the brackets (A) over the wall mount mollies (B) and
parally screw (C) into place. DO NOT TIGHTEN.
Step 4: Using a level, make sure the brackets are fully aligned.
Once aligned, ghten brackets securely in place.
The Wall Mount Accordion Drying Rack can now be mounted.
Dryer should slide onto brackets and sit securely in place.
Repeat steps 1-4 to for oponal wall mount in second locaon.
Step 2: Posion the second bracket making sure to align the
screw holes level with the first bracket.
Using a pen, mark the 3 screw hole locaons directly through
the bracket screw holes.
Note: the distances noted below are esmates and should be
confirmed before moving on to the next step.
WALL MOUNT ACCORDION DRYING RACK
ITEM#: 36101C
ASSEMBLY INSTRUCTIONS
IMPORTANT: RETAIN FOR FUTURE REFERENCE, READ CAREFULLY.
For assistance with use, parts and customer service call (203) 888.9208 Monday through Friday, 9AM to 5PM EST, email info@polder.com
or visit our website at www.polder.com. Customers in the UK can call +44 (0) 1243 780501 or visit www.polderproducts.co.uk
WALL MOUNT BRACKETS
(x4)
WALL MOUNT MOLLIES
(x12)
A B
PHILLIPS HEAD SCREWS
(x12)
C
ACCORDION DRYING RACK
(x1)
D
A A A
23.25” (59 cm)
20.7” (52.6 cm)
screw holes
21.85” (55.5 cm)
B
A
C
D