4117 Pinnacle Point Drive, Suite 400 • Dallas, TX 75211
1-800-AIR-VENT (247-8368)
Remove all roong materials for reroof applica-
tions. Install edge ashing and gutter straps
as necessary. Measure 5” from edge ashing
bend to mark lower slot line. Measure 3/4”
further up to mark upper slot line.
It is the installer’s responsibility to
ensure that there is a downward slope
across all shingle surfaces after Edge
Vent installation. This is of particular
note when using multi-layered or
architectural shingles.
Use utility knife to cut nal section to length.
Integrated end plug of nal section should be
ush with end of roof. Pre-fasten nal section.
Install either felt (warm weather climates) or
watrproong shingle underlayment (cold weather
climates) over The Edge Vent being careful to avoid
nailing into the roof deck slot. Using a chalk line,
transfer the nail line (2-5/8” from drip edge) and slot
location (5-3/4” to 7” from drip edge) to the top of
the felt or waterproong shingle underlayment.
Install starter and rst course shingles over felt/
waterproong shingle underlayment-covered The Edge
Vent using shingle manufacturer guidelines for shingle
overhang and nailing requirements. Nailing patterns
may have to deviate from some shingle installation
instructions to avoid nailing into the slot location.
For warranty information refer to enclosed document or visit www.airvent.com
NOTE: Air Vent’s written warranty for this product will be invalid in any instance in which the product was not property installed in accordance with the instructions.
Part #717440
©2017 Air Vent, Inc.
Rev. 03/2017
STEP 1.
STEP 2.
STEP 3.
STEP 4.
STEP 5.
Making sure the slot is open from step #2, position The
Edge Vent over venting slots. Make sure that the lower
edge of the venting is aligned with the edge ashing.
Start at end of roof so that end plug is ush with end.
Locating tabs on underside of The Edge Vent may assist
in positioning over slot. Use reinforced nail holes to
pre-fasten vent in place.
STEP 6.
INSTRUCTIONS FOR CUTTING SLOTS:
NOTE:
Hip & Gable Roofs
Cut 3/4" slot 5" up from drip edge.
Terminate slot 6" inside of end walls
and 12" from hip ridges.
Roofs with Valleys
Cut 3/4" slot 5" up from drip edge.
Terminate slot 6" inside of end walls
and at least 12" from valleys.
Chimneys
Cut 3/4" slot 5" up from drip edge.
Terminate slot 12" up from chimneys
that penetrate the roof.
–––––––– Slot cut Vent run End wall
Install either felt (warm weather climates) or
adhesive-backed waterproong shingle underlayment
(cold weather climates) onto the bare deck 10-1/2”
from the edge of roof up the slope.Cut slot with circu-
lar saw. Warning: Adjust depth of blade to avoid
cutting rafters or trusses. Refer to drawings below
for slot dimensions. Remove debris from slot.
**
Downward
Slope
Downward
Slope
Downward
Slope
Downward
Slope
Shingle Course 1
Shingle Course 2
Shingle Course 3