Gronomics REGB 18-34 Assembly Instructions

Type
Assembly Instructions
WWW.gronomics.com East Bethel, MN USA 763-753-7374
Rustic Elevated Garden Bed
(18” x 34”) Assembly Instruction
Continued
Product Care & Maintenance
Western Red Cedar will turn a weathered grey if left unfinished. Although no finish is required for cedar when used out-
doors, a natural oil finish applied regularly will help maintain the beauty and minimize cracking and drying. It is recom-
mended to use Gronomics Garden Bed Oil (Item# GBO-1Q), a non-toxic, food safe finish that is very easy to apply.
Apply oil when air and wind temperatures are between 50-90 degrees. Avoid applying in direct sunlight.
Parts List
ITEM QTY. PART # DESCRIPTION
1 4 3200E Corner Post, 4" x 4" x 32" w/2 Dovetailed Sides 12-3/4” long
2 2 R3102 Side Rail w/Cleat, 31” x 5-1/2” x 7/8”
3 2 R3100, R3100L Side Rail (one w/Logo), 31” x 5-1/2” x 7/8”
4 4 R1450 Side Rail, 14-1/2” x 5-1/2” x 7/8”
5 2 1538NRCorner Notched & Ripped Bottom Board, 15-3/8” x 4-1/2” x 1”
641538 Bottom Board, 15-3/8” x 5-1/2” x 1”
744545 Post Cap, 4-5/8” x 4-5/8” x 1-1/2”
81FL3652 Fabric Liner 36” x 52”
Stack matching pieces in piles. Using the parts list, locate
and count the individual pieces and verify that you have
received the correct number of pieces.
If any pieces are missing or replacement parts are required,
contact Gronomics at 1-855-299-6727.
NOTE: It is recommended to place a protective layer
between the ground and the pieces during assembly. This
will help prevent damage to the pieces.
Parts Identification Item #: REGB 18-34
1
1
8
7
6
5
34
2
Stand two 4” x 4” x 32” corner posts (Item 1) upright with slots
facing you and slots facing each corner post.
Locate a 31” x 5 1/2” side rail w/cleat (Item 2). With cleat located
at the bottom and facing you, install side rail w/cleat into the slots
and slide down to the bottom of the slots.
Repeat procedure for the two remaining 4” x 4” x 32” corner posts
and 31 x 5-1/2” side rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil
depth of approximately 9”. Reverse side rail w/cleat installation,
cleats located at top, if a soil depth of approximately 6” is
desired).
Side Rail Assembly
2
1Cleat
2
1
Packaged & Inspected by:Date:
WWW.gronomics.com East Bethel, MN USA 763-753-7374
Install two 14-1/2” x 5-1/2” side rails (Item 4) into the slots
and slide down to the bottom of the slots.
Side Rail Assembly Continued
3
4
4
Install two 31” x 5-1/2” side rails (Item 3) (one w/logo)
into the slots and slide down.
Install two 14-1/2” x 5-1/2” side rails (Item 4) into the slots
and slide down.
Final Side Rail Assembly
4
Logo
3
43
4
Place one 15-3/8” x 4-1/2” corner notched bottom board
(Item 5) on each end of the garden bed.
Place four 15-3/8” x 5-1/2” bottom boards (Item 6) into
the garden bed. (Gap boards evenly to allow for
water drainage).
Place fabric liner into the garden bed.
Soil Capacity: 2.7 Cubic Feet
Bottom Board and Fabric Installation
5
65
Remove the rubber cap from the corner posts studs.
Align the hole of the 4-5/8” x 4-5/8” post cap (Item 7) with
stud and tighten until the cap makes contact with the
post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Post Cap Assembly
6
  • Page 1 1
  • Page 2 2

Gronomics REGB 18-34 Assembly Instructions

Type
Assembly Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI