Keating iFM User manual

Type
User manual
www.keatingofchicago.com 1-800-KEATING
SERVICE BULLETIN
080899 11/05
IFM FRYER (FLOOR MODELS ONLY)
If a popping noise is heard from the fryer during the cooking cycle, the following checks must
be made in this order:
1. Fryer manifold gas pressure
Natural gas – 3.0 inches w/c
Propane gas – 10.5 inches w/c
2. Incoming gas pressure
Natural gas – 7.0 inches w/c
Propane gas – 11.0 inches w/c
3. Adjust the pilot adjustment screw in the gas valve.
The adjustment screw is located on top of the gas valve next to the black
electrical housing.
The pilot adjustment screw is located underneath the round head screw "A". Adjust with a small
screw driver turn the adjustment screw clockwise until it is all the way down. Then turn the
adjustment screw two full turns counterclockwise.
A
  • Page 1 1

Keating iFM User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI

in other languages