WC-WHE009-80-DBL
Overmount Installation Guide
80″
PACKING LIST
INSTALLATION AND ADJUSTMENT OF HINGES
REQUIRED TOOLS NOT IN BOX
12
300m
m
"
-
CH
N
Main cabinet / 1 Counter / 1 Sink / 2
Install screws
and cover / 6
Install screws / 24
Metal bracket / 6
install
Tape Measure Pencil Electric Drill Phillips Screwdriver Adjustable Wrench Spirit Level Silicone sealant
remove
adjust height adjust laterally adjust depth
INSTALLATION INSTRUCTIONS
1 Drill holes to match
stud placement in wall.
2 Installer must cut appropriately sized
hole in back of cabinet to accomodate
existing placement of hot&cold wall valves
and drain
5 Install the counter.
Seal around the top of
cabinet with clear or white
silicone sealant
6 Install the sink
and pop-up drain. Seal
around the base of the sink
with clear or white silicone sealant.
3 Matching holes may be predrilled
in wall
4 Attach vanity to wall.
OPTIONAL OPTIONAL
• Prior to installation please check received
items against the "Packing List".
Please report any missing items to your
retailer immediately.
• Protect all surfaces from sharp objects,
high heat sources,direct prolonged
sunlight and chemical hazards.
• Professional installation recommended.