1. General
1.1 This procedure describes Pretium EDGE
Tap Modules, which are available for both multimode
and single mode applications. Compatible with all
Pretium EDGE rack-mountable connector housings,
TAP modules have twelve front-mounted shuttered
LC adapters and two MTP
®
connectors in back
(Figure 1).
1.2
Themodulecontains12beropticsplitterswhichdividetheincomingopticalsignalsintotwo
outputs,oneforlivelinktrafcandoneformonitoring.Themonitortrafcisroutedviathe“TAP”-labeled
MTPconnectortoamonitoringdevicewhichltersthedataandsendsittovarioussoftwaretoolsfor
analysis, where it is then viewed in application-layer software for security threats, performance issues, or
system optimization.
IMPORTANT:
Please note that Tap module systems have two outputs for each input, which may
requiretwopowermeters,anddependingonthesystemconguration,possiblyrequireanadditional
craftsperson in another location.
1.4 If this procedure is reissued, a summary of the changes will appear in this paragraph.
2
1
B
A
1
4
3
B
A
2
6
5
B
A
3
8
7
B
A
4
10
9
B
A
5
12
11
B
A
6
VOID
W
A
R
R
A
N
T
Y
Port Tap Module
M
Part Number:
Serial
MADE IN MEXICO
US PATENT NO.
TAP
LIVE
Figure 1
HPA-0753
related literature |
SRP-003-794, Pretium EDGE
®
Solution
SRP-006-136,MultiberConnectorandPortCleaningwiththeTKT-CLEAN-MFC-Mkit
table of contents |
1. General .................................................................................................................................................1
2. Precautions ...........................................................................................................................................2
3. Tools and Materials ...............................................................................................................................2
4. Connector and Adapter Cleaning ..........................................................................................................2
5. Calculating System Loss .Budgets .......................................................................................................3
6. The Functionality of the Tap Module Splitters .......................................................................................5
7. Installing Pretium EDGE Tap Modules ...................................................................................................6
8. Referencing the Test Equipment for a Tap Module ...............................................................................6
9. Testing Pretium EDGETap Modules .....................................................................................................8