![](//vs1.manuzoid.com/store/data-gzf/5b7a6be3a993f2e1d1d3e963ec852067/2/002072031.htmlex.zip/bg3.jpg)
31355848-W2-C
1. Read all of these instructions and retain this guide for later use.
2. Pass on this guide in the event of change of ownership of the installation site.
3. Follow all warnings, cautions and instructions contained in this guide.
4. Warning! Two-person lift.
5. Check for transit damage.
6. Carefullyunpackandcheckthetrayforcolour,size,atness,generalacceptability
andcompatibilitywiththeshowerenclosureandotherbathroomfurniture.
7. Beforeinstallation,carefullyremovealloftheprotectivelmfromthetrayfor
inspection.Theslateandanti-sliptraysdonothaveaprotectivelm.
8. Reportanyfaultsimmediatelytoyoursupplier.Noclaimswillbeconsideredafter
installation.
9. Storetrayat.DO NOT lean against wall.
10. Fitting this product is acceptance of quality.
11. Caution! Additionalprotectivecoveringssuchasadustsheetshouldbeused
toprotectthetrayfromdamagefromfallingobjectsduringinstallation.
12.Werecommendthistrayisttedaspartofafullyenclosedcubical.Ifthistray
isttedasawalk-ininstallation,itisexpectedthatanamountofwaterwillspill
ontotheopenareaoftheoor.Wewouldthereforeadvisexingathreshold
strip to minimize this.
Note:Wheretheshowertraycomesintocontactwiththewallorplasterboard
surface,applyaliberalamountofsiliconesealantbeforeinstallation.Thiswill
helpsecuretheshowertrayinpositionandreduceanyrubbingofthesurfaces.
13.Hand tighten the waste xing screws to ensure a watertight seal. Excessive
overtightening can lead to damage. Caution! DO NOT stand on waste cover
as damage may occur.
14.Oncethewastepipehasbeenconnectedpourwaterintothetraytocheckthe
trayandpipeconnectionforcorrectdrainagepriortonalxandtiling.
15.Thewasteshouldbeconnectedto40mmrigidwastepipeonly,whichmustbe
installed to have a minimum fall of 18 mm per meter. The use of reducers or
exiblewastepipesarenotsuitableforthisproduct,andmayleadtowaterbuild
upinthetrayandpotentialoverowing.
16.Excessiveowratesmayleadtooverowingandleaking.Flowrateintothetray
mustnotexceedmorethan25litresperminute.Werecommendadrainagetest
iscarriedouttoensurethewastepipeworkisadequatefortheowdelivered.
General Information